Basement Flat 6 Marshall Place Perth PH2 8AH Data via plota.co.uk

26/01245/FLL - planning permission local Awaiting decision

Proposal

Change of use of flat to a flexible hybrid use as flat and short-term let accommodation unit Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Aug 2026
✓
Validated
1 Sept 2026
Decision
Expected by 27 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 28 Oct 2026, from Perth's recent changes of use. The consultation period closed on 2 Oct 2026.

Site constraints 5

Grade B listed: 6 Marshall Place, Perth
List entry LB39552 · 4 m away · 4 more listed buildings within 150 m (1 Grade B, 3 Grade C)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic Environment Scotland ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Perth Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Scheduled monument 34 m away: Perth, Cromwell's Citadel
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic Environment Scotland ↗
Special area of conservation 209 m away: River Tay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Perth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Perth
Application type
planning permission local
Postcode
PH2 8AH
Received
31 Aug 2026
Validated
1 Sept 2026
Ward
Perth City Centre
Parish
Central
Case officer
Show
Applicant
Show
Agent
MCADS

Decision outlook

Day 33 of the 56-day target. Perth usually decides changes of use by day 57.

Day 3324 days to the predicted decision (day 57)
50%decided within 8 weeks
96%approved
90decided in the last year

Plota live figures for changes of use decided by Perth in the last twelve months, from validation. Perth decision record →

Consultation & key dates

Comments by
2 Oct 2026
Env. assessment
No