Woodlands Bridge Lane PENRITH Data via plota.co.uk

2026/1456/TPO - Tree Preservation Order Approved

Proposal

Works to trees subject to Tree Preservation Order TPO 02. T13 & T16 Sycamore - fell. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jul 2026
✓
Approved
26 Aug 2026

Approved on 26 Aug 2026 · Delegated · Last checked 15 Sept 2026

Site constraints 5

Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 208 m away: A66 Northern Trans-Pennine Project
The site is about 208 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 4; 1 listed building within 150 m of the postcode pin; Inside the Penrith built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Postcode
CA11 8GW
Received
20 Jul 2026
Validated
20 Jul 2026
Ward
Penrith South
Parish
Penrith
Case officer
Show
Decision
TPO Approved
Decision date
26 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
Evergreen gardens and design

How this decision compares

Decided in 37 days from validation, 4 days slower than Westmorland and Furness's median of 33 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

96%decided within 8 weeks
99%approved
233decided in the last year

Plota live figures for tree and landscaping works decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Statutory expiry
13 Sept 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026