land at South Killingholme, Immingham DN40 3DZ Data via plota.co.uk

PA/SCO/2026/519 - Scoping Opinion Decided

Proposal

EIA scoping request, Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 29 Apr 2026
✓
Advice
22 Jun 2026

Advice on 22 Jun 2026 · Last checked 24 Sept 2026

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Able Marine Energy Park
The site is inside the project boundary. Harbour, decided. The project page says whether consent was granted. Also within 2 km: Able Marine Energy Park Material Change 2 (decided, the site is inside its boundary); VPI Immingham OCGT (decided, about 577 m); Viking CCS Pipeline (decided, about 1110 m); A160 - A180 Port of Immingham Improvement (decided, about 1226 m); Hornsea Offshore Wind Farm (Zone 4) - Project Two (decided, about 1362 m); Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, about 1362 m); North Killingholme Power Project (decided, about 1402 m); Humber Carbon Capture Pipeline (at pre-application, the site is inside its boundary); H2East Pipeline: Humber to Nottinghamshire (at pre-application, about 194 m); Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, about 1606 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the North Killingholme built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Scoping Opinion
Postcode
DN40 3DZ
Received
around 29 Apr 2026
Validated
29 Apr 2026
Ward
Ferry
Case officer
Show
Decision
Advice
Decision date
22 Jun 2026

Consultation & key dates

Comments by
14 May 2026
North Lincs
Planning Authority Score
4.6/10
Below average
#169 of 296 councils
Relevant to this application:
Householder decisions

North Lincs ranks #123 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Lincs decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #195 of 296
91%
Householder approved
Above avg (90%) #177 of 296
70%
Decided in 8 weeks
Above avg (63%) #123 of 296
44%
Extended time limit
Above avg (41%) #182 of 296
70%
Minor dwellings approved
114 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
78%
Change of use approved
37 decided
705
Total decisions
96 refused in the year to March 2026