BRYN BELLA COTTAGE, Fachwen, Caernarfon, Gwynedd, LL55 3HD Data via plota.co.uk

C26/0620/18/DT - Householder Planning In Progress

Proposal

Cais i godi uchder tô ynghyd â gosod paneli solar ar dô'r eiddo gwreiddiol ac ymestyn estyniad cefn to un brig ynghyd a newidiadau ac addasiadau ychwanegol. Application to raise the height of the roof, together with the installation of solar panels on the roof of the original dwelling, and to extend the rear mono-pitched roof extension, along with additional alterations and modifications. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
✓
Validated
15 Oct 2026
Decision
Expected by 10 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 27 Dec 2026 and 27 Jan 2027, from Gwynedd's recent extensions.

Comments are open until 18 Nov 2026

Comment on this application ↗

Site constraints 6

World heritage site: World Heritage Site
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 748 m away: Glyn Rhonwy Pumped Storage
The site is 748 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m; SSSI 288 m away: Llyn Padarn; Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Householder Planning
Postcode
LL55 3HD
Received
14 Oct 2026
Validated
15 Oct 2026
Ward
Deiniolen
Parish
Llanddeiniolen
Case officer
Show
Target decision
10 Dec 2026
Decision level
Dirprwyedig / Delegated
Applicant
Show

Decision outlook

Day 34 of the 56-day target. Gwynedd usually decides extensions by day 87.

Day 3453 days to the predicted decision (day 87)
26%decided within 8 weeks
93%approved
246decided in the last year

Plota live figures for extensions decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
18 Nov 2026
Statutory expiry
10 Dec 2026