Tatton Motorway Service Area, Land Between Junctions 7 And 8 Of The M56 , Rostherne, WA14 3SD Data via plota.co.uk

26/1666/NMA - Non-Material Amendment Pending Consideration

Proposal

Non-Material Amendment to approval 25/3586/VOC to change the surface water drainage proposals and to relocate pedestrian crossing point southwards Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 May 2026
Decision
Expected by 2 Jun 2026

Under consideration

No decision has been issued yet. A decision is expected by 2 Jun 2026.

The consultation period closed on 22 Jun 2026.

Documents 21

Plans & drawings 16

PDF Proposed Masterplan Phase 2 - 2237-HWS-SWD-ZZ-D-A-050006_P02 Submitted Plans · 6 May 2026 View ↗ PDF Proposed Masterplan Phase 1- 2237-HWS-SWD-ZZ-D-A-050005_P02 Submitted Plans · 6 May 2026 View ↗ PDF On Site Foul Outfall Phase 2 - M56MSA-BWB-HDG-ZZ-DR-CD-0551 S4 P07 Submitted Plans · 6 May 2026 View ↗ PDF On Site Foul Outfall Phase 1 - M56MSA-BWB-HDG-ZZ-DR-CD-0551 S4 P07 Submitted Plans · 6 May 2026 View ↗ PDF MSA area subject to HS2 planning condition Phase 1 - M56-BWB-GEN-XX-SK-CH-SK027 S4 P02 Submitted Plans · 6 May 2026 View ↗ PDF MSA area subject to HS2 planning condition Phase 2 - M56-BWB-GEN-XX-SK-CH-SK026 S4 P06 Submitted Plans · 6 May 2026 View ↗ PDF Yarwoodheath Lane walking and cycling proposals Phase 2 - M56-BWB-GEN-XX-SK-CH-SK019 S4 P03 Submitted Plans · 6 May 2026 View ↗ PDF Yarwoodheath Lane walking and cycling proposals Phase 1 - M56-BWB-GEN-XX-SK-CH-SK018 S4 P08 Submitted Plans · 6 May 2026 View ↗ PDF Cut and Fill EW Strategy Phase 2 - M56-BWB-DGT-XX-DR-C-631 S4 P14 Submitted Plans · 6 May 2026 View ↗ PDF Cut and Fill EW Strategy Phase 1 - M56-BWB-DGT-XX-DR-C-631 S4 P14 Submitted Plans · 6 May 2026 View ↗ PDF Proposed Finished Levels Phase 2 - M56-BWB-DGT-XX-DR-C-601 S4 P16 Submitted Plans · 6 May 2026 View ↗ PDF Proposed Finished Levels Phase 1 - M56-BWB-DGT-XX-DR-C-601 S4 P16 Submitted Plans · 6 May 2026 View ↗ PDF Softworks Phase 1 - 2607.2-PLA-XX-XX-DR-L-2026 Submitted Plans · 6 May 2026 View ↗ PDF Landscape Masterplan Phase 1 - 2607.2-PLA-XX-XX-DR-L-0003 Submitted Plans · 6 May 2026 View ↗ PDF Softworks Phase 2 - 2607-PLA-XX-XX-DR-L-2026 Submitted Plans · 6 May 2026 View ↗ PDF Landscape Masterplan Phase 2 - 2607-PLA-XX-XX-DR-L-0002 Submitted Plans · 6 May 2026 View ↗

All documents on the council site ↗

Associated applications 6

Site constraints 7

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Public footpath about 25 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
National infrastructure project about 1100 m away: A556 Knutsford to Bowdon Scheme; Nature recovery project: Lost Wetlands; Priority habitat about 25 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment
Postcode
WA14 3SD
Received
5 May 2026
Validated
5 May 2026
Ward
Mobberley
Parish
Millington and Rostherne
Case officer
Show
Target decision
2 Jun 2026
Decision level
Delegation
Applicant
Show
Agent
Pegasus Group

Consultation & key dates

Comments by
22 Jun 2026
Statutory expiry
2 Jun 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 councils
Relevant to this application:
Householder decisions

Cheshire East is one of the slowest councils in England for householder decisions, ranking #268 out of 296. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026