Land At Stone Farm Main Street Ash Martock Somerset Data via plota.co.uk

26/00854/FUL - Full Application Approved

Proposal

Demolition of existing agricultural building and erection of dwelling to replace scheme permitted by Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Apr 2026
✓
Validated
27 Apr 2026
✓
Approved
13 Jul 2026

Approved on 13 Jul 2026 · Delegated (Use on Recommendations) · Last checked 14 Jul 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive
    • FullDemolition of existing agricultural building and erection of dwelling to replace scheme…This application26/00854/FUL

Site constraints 3

Nutrient neutrality catchment: Parrett Catchment
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Somerset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
TA12 6PH
Received
14 Apr 2026
Validated
27 Apr 2026
Ward
MARTOCK
Parish
Ash
Target decision
22 Jun 2026
Decision
Application Permitted with Conditions
Decision date
13 Jul 2026
Decision level
Delegated (Use on Recommendations)
Applicant
Show
Agent
Whiteacre Planning Ltd

How this decision compares

Decided in 77 days from validation, 51 days slower than South Somerset's median of 26 for agricultural works. Approved, as 99% of agricultural works here are.

83%decided within 8 weeks
99%approved
110decided in the last year

Plota live figures for agricultural works decided by South Somerset in the last twelve months, from validation. South Somerset decision record →

Consultation & key dates

Alt. reference
PP-14856751
Planning Portal ref
PP-14856751
Statutory expiry
22 Jun 2026
Env. assessment
No