New Hall Stables Lancaster Road Pilling Preston Lancashire PR3 6SQ Data via plota.co.uk

Proposal

Erection of self-build dwelling (C3) for a rural worker with package treatment plant for foul waste. Change of use of part of existing stables to form a specialist equine dental unit and post operative aftercare stable (Sui Generis). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Validated
23 Apr 2026
✓
Consultation
14 May 2026
✗
Refused
1 Jul 2026
Appeal
Not lodged

Refused on 1 Jul 2026 · Committee Decision · Last checked 5 Jul 2026

Documents 32

All documents on the council site ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 530 m away: Preesall Saltfield Underground Gas Storage
The site is about 530 m from the project boundary. Underground gas storage, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Morecambe Bay Limestones and Wetlands.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wyre - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wyre
Application type
Full Application
Postcode
PR3 6SQ
Received
15 Apr 2026
Validated
23 Apr 2026
Ward
Pilling
Parish
Pilling
Case officer
Show
Target decision
18 Jun 2026
Decision
Application Refused
Decision date
1 Jul 2026
Decision level
Committee Decision
Applicant
Show
Agent
Rural Futures

How this decision compares

Decided in 69 days from validation, 24 days slower than Wyre's median of 45 for agricultural works. Refused, as 29% of agricultural works here are.

61%decided within 8 weeks
71%approved
9%go to committee

Plota live figures for agricultural works decided by Wyre in the last twelve months, from validation. Wyre decision record →

Consultation & key dates

Alt. reference
PP-14853681
Planning Portal ref
PP-14853681
Neighbours
27 Apr 2026
Consultation
14 May 2026
Comments by
12 Jun 2026
Site or press notice
22 May 2026
Committee
1 Jul 2026
Statutory expiry
18 Jun 2026
Env. assessment
No
Wyre
Planning Authority Score
1.2/10
Poor
#288 of 296 councils
Relevant to this application:
Change of use

Wyre is one of the slowest councils in England for householder decisions, ranking #272 out of 296. The council extends the time limit on 66% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wyre decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #243 of 296
88%
Householder approved
Below avg (90%) #228 of 296
38%
Decided in 8 weeks
Below avg (63%) #272 of 296
66%
Extended time limit
Above avg (41%) #281 of 296
56%
Minor dwellings approved
41 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
75%
Change of use approved
52 decided
539
Total decisions
90 refused in the year to March 2026