Land Adjacent To Twinwoods Business Park Thurleigh Road Milton Ernest Bedfordshire Data via plota.co.uk

26/00714/M73 - Major S73 Variation of Condition Approved

Proposal

Temporary development of a Battery Energy Storage System (BESS) with ancillary infrastructure, acoustic and security fencing, access, landscaping and biodiversity enhancements, to provide balancing services to the local electricity grid, and associated development. including variation of approved plans condition 1 and condition 6 attached to , to allow for updated battery specifications and associated internal layout changes; revised perimeter security fencing and gate details; and a consequential updated Noise Impact Assessment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Consultation
22 Apr 2026
✓
Approved
30 Jun 2026

Approved on 30 Jun 2026 · Officers (Delegated) · Last checked 13 Jul 2026

Associated applications 2

  • Part of

    Amendmentcouncil archive

    Conditions 1, 6 varied

    • VariationTemporary development of a Battery Energy Storage System (BESS) with ancillary infrastructure…This application26/00714/M73

Site constraints 3

Also on the record
1 listed building within 150 m of the postcode pin; Inside the Milton Ernest built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bedford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bedford
Application type
Major S73 Variation of Condition
Postcode
MK44 1FD
Received
15 Apr 2026
Validated
15 Apr 2026
Ward
Riseley
Parish
Milton Ernest
Case officer
Show
Target decision
7 Jul 2026
Decision
Grants Temporary Permission
Decision date
30 Jun 2026
Decision level
Officers (Delegated)
Applicant
Show
Agent
Pathfinder Clean Energy - Mr H Coles

How this decision compares

Decided in 76 days from validation, 4 days faster than Bedford's median of 80 for commercial and major works. Approved, as 80% of commercial and major works here are.

14%decided within 8 weeks
80%approved
6%go to committee

Plota live figures for commercial and major works decided by Bedford in the last twelve months, from validation. Bedford decision record →

Consultation & key dates

Alt. reference
PP-14714518
Planning Portal ref
PP-14714518
Neighbours
22 Apr 2026
Consultation
22 Apr 2026
Comments by
25 May 2026
Site or press notice
27 Apr 2026
Env. assessment
No
Bedford
Planning Authority Score
2.4/10
Poor
#253 of 296 councils
Relevant to this application:
Major dwellings

Bedford is slower than most councils at deciding householder applications, ranking #201 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bedford decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #259 of 296
86%
Householder approved
Below avg (90%) #239 of 296
56%
Decided in 8 weeks
Below avg (63%) #201 of 296
52%
Extended time limit
Above avg (41%) #233 of 296
52%
Minor dwellings approved
109 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
67%
Change of use approved
57 decided
993
Total decisions
203 refused in the year to March 2026