31 Main Street Tickton East Riding Of Yorkshire Data via plota.co.uk

26/00721/PLF - Full Planning Permission Withdrawn

Proposal

Change of use of public house to dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Mar 2026
✓
Validated
8 Apr 2026
−
Withdrawn
29 May 2026
✓
Consultation
3 Jun 2026

Withdrawn on 29 May 2026 · Delegated Decision · Last checked 6 Jul 2026

Associated applications 4

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Tickton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project 74 m away: Dogger Bank South Offshore Wind Farms
The site is 74 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Dogger Bank Creyke Beck (decided, 845 m); Peartree Hill Solar Farm (decided, 1.3 km); Dogger Bank D Wind Farm (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Tickton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
HU17 9SZ
Received
20 Mar 2026
Validated
8 Apr 2026
Ward
Beverley Rural
Parish
Tickton Parish Council
Case officer
Show
Target decision
3 Jun 2026
Decision
Withdrawn
Decision date
29 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Evolution Town Planning Ltd

Consultation & key dates

Alt. reference
PP-14785715
Planning Portal ref
PP-14785715
Neighbours
3 Jun 2026
Consultation
3 Jun 2026
Comments by
3 Jun 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 overall
Relevant to this application:
Change of use

East Riding is one of the fastest councils in England for householder decisions: #7 of 296 on speed. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026