Dunning Building Daedalus Drive Lee-on-the-solent Hampshire PO13 9GX Data via plota.co.uk

26/00108/FULL - Devt. app. FULL Registered

Proposal

ERECTION OF BUILDING FOR EMPLOYMENT / INDUSTRIAL PURPOSES (CLASS B2) (RETROSPECTIVE) (Amended description) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
26 Mar 2026
Validated
7 Apr 2026
Consultation
22 Apr 2026
Decision
Expected by 10 Aug 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision soon after comments close on 9 Jul 2026; it is now day 158. The consultation period closed on 9 Jul 2026.

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Special protection area 372 m away: Solent and Dorset Coast; SSSI 376 m away: Lee-on-The Solent to Itchen Estuary SSSI; 1 listed building within 150 m; Inside the Lee-on-the-Solent built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gosport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gosport
Application type
Devt. app. FULL
Postcode
PO13 9GX
Received
26 Mar 2026
Validated
7 Apr 2026
Ward
Lee West
Case officer
Show
Target decision
10 Aug 2026
Applicant
Show
Agent
Fusion Architects

Decision outlook

Day 158, past the statutory target. 94% of full applications in Gosport are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 11 Sept 2026.

Day 158102 days past the 56-day target
85%decided within 8 weeks
95%approved
96decided in the last year

Plota live figures for full applications decided by Gosport in the last twelve months, from validation. Gosport decision record →

Public comments

1comment received
1 objecting

26 neighbours consulted · Last counted 11 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14765018
Neighbours
17 Jun 2026
Consultation
22 Apr 2026
Comments by
9 Jul 2026
Site or press notice
18 Jun 2026
Statutory expiry
2 Jun 2026
Env. assessment
No
Gosport
Planning Authority Score
8.3/10
Excellent
#19 of 296 councils
Relevant to this application:
Householder decisions

Gosport is faster than most councils at deciding householder applications, ranking #66 out of 296. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Gosport decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #38 of 296
97%
Householder approved
Above avg (90%) #32 of 296
76%
Decided in 8 weeks
Above avg (63%) #66 of 296
30%
Extended time limit
Below avg (41%) #54 of 296
67%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
85%
Change of use approved
13 decided
226
Total decisions
13 refused in the year to March 2026