26/00129/FUL - Full Application Approved

Proposal

Proposed underground cables and associated works - cables to form part of amended cable route to connect proposed solar farm at Land To The West of Lanhams to National Grid Braintree 400 kV Substation consented under (planning permission ref: ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jan 2026
✓
Approved
17 Jun 2026

Approved on 17 Jun 2026 · Delegated Decision · Last checked 10 Oct 2026

Associated applications 12

Site constraints 4

1 listed building within 150 m of the postcode pin
Nearest: Fowler's Farmhouse, Grade II, about 6 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Braintree built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a solar farm?

Plota Sites searches every land parcel in England and Wales: 29,327 sites fit this search. On and off the market, free to search.

Land for solar farms
Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Braintree
Application type
Full Application
Postcode
CM77 8EZ
Received
20 Jan 2026
Validated
20 Jan 2026
Ward
Silver End & Cressing
Parish
Cressing Parish Council
Case officer
Show
Target decision
17 Mar 2026
Decision
Application GRANTED
Decision date
17 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Envams

How this decision compares

Decided in 148 days from validation, 93 days slower than Braintree's median of 55 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

69%decided within 8 weeks
98%approved
43decided in the last year

Plota live figures for utility and infrastructure works decided by Braintree in the last twelve months, from validation. Braintree decision record →

Consultation & key dates

Comments by
20 Mar 2026
Statutory expiry
17 Mar 2026
Env. assessment
No
Braintree
Planning Authority Score
7/10
Good
#61 of 296 overall
Relevant to this application:
Householder decisions

Braintree is faster than most councils at deciding householder applications: #47 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026