39 - 40 New Bond Street London
Description
Installation of plant at roof level within existing acoustic enclosure, new intake and extract louvres within existing openings, and associated pipework and servicing infrastructure. Installation of new HVAC and M&E systems, raised access flooring, new lighting and fit-out, formation of meeting rooms, and refurbishment of the ground floor entrance lobby; together with external alterations comprising. Internal and external refurbishment works, including full internal strip-out and reconfiguration at Levels 3 and 5. (Linked with 26/01898/FULL)
Westminster ranks #172 out of 282 councils for householder decision speed. Only 27% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.
Nearby applications
The Dilly 21 Piccadilly London W1J 0BH
Detailed drawings of the existing windows and historic secondary glazing, and th...
The Dilly 21 Piccadilly London W1J 0BH
Detailed drawings of the existing windows and historic secondary glazing, and th...
14 - 16 Ganton Street London W1F 7BT
Display of one internally illuminated projecting sign measuring 0.5m x 0.1m (SPL...
17 - 21 South Audley Street London W1K 2NY
Details of condition surveys, method statements and details (as specified below)...
1 Welbeck Street London W1G 0AR
Erection of an extension at sixth floor of 1-2 Welbeck and associated works.
6 - 8 Mill Street London W1S 2AZ
Detailed drawings of the fixed glazed awning and retractable awning pursuant to ...