7 Seaway Gardens, St Marys Bay, Romney Marsh, TN29 0RY Data via plota.co.uk

26/0068/FH - Lawful development Approved

Proposal

Lawful development certificate (proposed) for single storey rear extension following demolition of existing conservatory. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Jan 2026
✓
Approved
2 Feb 2026

Approved on 2 Feb 2026 · Last checked 14 Sept 2026

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Special protection area about 281 m away: Dungeness, Romney Marsh and Rye Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI about 440 m away: Rye Harbour SSSI; Inside the St Mary's Bay built-up area; National infrastructure project about 1.8 km away: Shepway Energy Park, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Shepway - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shepway
Application type
Lawful development
Postcode
TN29 0RY
Received
14 Jan 2026
Validated
14 Jan 2026
Ward
Romney Marsh
Parish
St. Mary in the Marsh
Case officer
Show
Target decision
11 Mar 2026
Decision
Lawful
Decision date
2 Feb 2026
Applicant
Show

How this decision compares

Decided in 19 days from validation, 30 days faster than Shepway's median of 49 for demolitions. Approved, as 85% of demolitions here are.

98%decided within 8 weeks
85%approved
47decided in the last year

Plota live figures for demolitions decided by Shepway in the last twelve months, from validation. Shepway decision record →

Public comments

No public comments yet.

Last counted 14 Sept 2026

Read the comments on the council site ↗

Shepway
Planning Authority Score
7.4/10
Good
#49 of 296 overall
Relevant to this application:
Householder decisions

Shepway is one of the fastest councils in England for householder decisions: #5 of 296 on speed. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shepway decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #247 of 296
88%
Householder approved
Below avg (90%) #219 of 296
96%
Decided in 8 weeks
Above avg (63%) #5 of 296
12%
Extended time limit
Below avg (41%) #5 of 296
61%
Minor dwellings approved
95 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
32 decided
761
Total decisions
139 refused in the year to March 2026