Rh & Dr St Marys Bay Station, Jefferstone Lane, St Marys Bay Data via plota.co.uk

26/1354/FH - Full Planning Permission Approved

Proposal

Erection of a lattice mast (20 metres high) with associated fencing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Aug 2026
✓
Validated
28 Aug 2026
✓
Approved
30 Oct 2026

Approved on 30 Oct 2026 · Last checked 31 Oct 2026

Planning committee

Decided by Shepway Planning and Licensing Committee on 27 Oct 2026.

Approved by 11 votes to 0

No officer report was published for this decision; this summary is from the committee minutes.

  • Planning permission was granted subject to conditions, with authority delegated to finalise their wording.
  • A public objection was read out, while the applicant spoke in support.
  • The application was approved by 11 votes, with no votes against or abstentions.
Read how the committee decided The proposed mast, public comments, applicant’s support, committee vote and decision.

Source: Plota analysis of Shepway's committee minutes of 27 Oct 2026.

Documents 30

All documents on the council site ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
SSSI about 496 m away: Rye Harbour SSSI; Inside the St Mary's Bay built-up area; National infrastructure project about 1.8 km away: Shepway Energy Park, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Shepway - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shepway
Application type
Full Planning Permission
Postcode
TN29 0SG
Received
18 Aug 2026
Validated
28 Aug 2026
Ward
Romney Marsh
Parish
St. Mary in the Marsh
Case officer
Show
Target decision
6 Nov 2026
Decision
Approve with Conditions
Decision date
30 Oct 2026
Applicant
Show

How this decision compares

Decided in 63 days from validation, 11 days slower than Shepway's median of 52 for full applications. Approved, as 80% of full applications here are.

84%decided within 8 weeks
80%approved
256decided in the last year

Plota live figures for full applications decided by Shepway in the last twelve months, from validation. Shepway decision record →

Public comments

No public comments yet.

Last counted 31 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
28 Sept 2026
Shepway
Planning Authority Score
7.4/10
Good
#49 of 296 overall
Relevant to this application:
Householder decisions

Shepway is one of the fastest councils in England for householder decisions: #5 of 296 on speed. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shepway decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #247 of 296
88%
Householder approved
Below avg (90%) #219 of 296
96%
Decided in 8 weeks
Above avg (63%) #5 of 296
12%
Extended time limit
Below avg (41%) #5 of 296
61%
Minor dwellings approved
95 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
32 decided
761
Total decisions
139 refused in the year to March 2026