Hunters Hall Farm, Chambers Manor Farm Lane, Epping Upland, Epping, CM16 6PL Data via plota.co.uk

EPF/2373/25 - Full planning permission Under Consultation

Proposal

Retrospective consent for change of use of former stable block to office space (use class E). External and internal refurbishment works to bring the building into viable use. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
24 Nov 2025
Validated
26 Nov 2025
Decision
Expected by 21 Jan 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 12 Sept 2026; it is now day 290. The consultation period closed on 18 Dec 2025.

Documents 24

All documents on the council site ↗

Site constraints 3

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Epping Forest - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
CM16 6PL
Received
24 Nov 2025
Validated
26 Nov 2025
Ward
Epping West and Rural
Parish
Epping Upland
Case officer
Show
Target decision
21 Jan 2026
Applicant
Show
Agent
D Rusu

Decision outlook

Day 290, past the statutory target. 85% of changes of use in Epping Forest are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 6 Sept 2026.

Day 290234 days past the 56-day target
55%decided within 8 weeks
56%approved
55decided in the last year

Plota live figures for changes of use decided by Epping Forest in the last twelve months, from validation. Epping Forest decision record →

Public comments

No public comments yet.

Last counted 6 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
18 Dec 2025
Epping Forest
Planning Authority Score
4.5/10
Below average
#172 of 296 councils
Relevant to this application:
Change of use

Epping Forest ranks #114 out of 296 councils for householder decision speed. Epping Forest is also one of the strictest councils - it refuses more householder applications than almost any other, with only 76% approved vs 90% nationally.

One of the strictest councils
only 76% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Epping Forest decision statistics
Based on MHCLG data, the year to March 2026
67%
Overall approval rate
Below avg (87%) #295 of 296
76%
Householder approved
Below avg (90%) #290 of 296
71%
Decided in 8 weeks
Above avg (63%) #114 of 296
34%
Extended time limit
Below avg (41%) #87 of 296
49%
Minor dwellings approved
228 decided (1-9 homes)
55%
Major dwellings approved
20 decided (10+ homes)
49%
Change of use approved
43 decided
1,307
Total decisions
429 refused in the year to March 2026