Amazon Apartments New River Avenue Hornsey London N8 7QE Data via plota.co.uk

HGY/2025/3607 - Works to trees in Conservation Area Approved

Proposal

Multiple mature trees located across the New River Village estate (within the Conservation Area), primarily adjacent to estate roads, footpaths and lighting columns. Proposed works comprise selective pruning and crown lifting only, limited to the removal of secondary and tertiary branches that are obstructing street and footpath lighting. No felling is proposed. No reduction to primary structure. Works are intended solely to improve light penetration, visibility and safety at ground level, and to maintain the trees in a healthy condition. The trees are shown approximately on the submitted annotated plan. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 30 Dec 2025
✓
Approved
19 Jan 2026

Approved on 19 Jan 2026 · Delegated Decision · Last checked 22 Aug 2026

Site constraints 9

Hornsey Water Works & Filter Beds conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Hornsey Water Works and Filter Beds, Hornsey
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Haringey AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
3 listed buildings within 150 m of the postcode pin; Local nature reserve about 405 m away: Alexandra Palace & Park; Inside the Haringey built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Metropolitan Open Land about 29 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Haringey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Haringey
Application type
Works to trees in Conservation Area
Postcode
N8 7QE
Received
around 30 Dec 2025
Validated
30 Dec 2025
Ward
Hornsey
Case officer
Show
Decision
No Objection
Decision date
19 Jan 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 20 days from validation, 7 days faster than Haringey's median of 27 for tree works. Approved, as 98% of tree works here are.

79%decided within 8 weeks
98%approved
357decided in the last year

Plota live figures for tree works decided by Haringey in the last twelve months, from validation. Haringey decision record →

Public comments

No public comments yet.

Last counted 22 Aug 2026

Read the comments on the council site ↗

Haringey
Planning Authority Score
4/10
Below average
#192 of 296 overall
Relevant to this application:
Other decisions

Haringey is slower than most councils at deciding householder applications: #209 of 296 on speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Haringey decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #206 of 296
91%
Householder approved
Above avg (90%) #174 of 296
55%
Decided in 8 weeks
Below avg (63%) #209 of 296
40%
Extended time limit
Below avg (41%) #151 of 296
83%
Minor dwellings approved
279 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
46%
Change of use approved
28 decided
1,469
Total decisions
217 refused in the year to March 2026