170 Graham Road, Hackney, London, E8 1BS Data via plota.co.uk

2026/2365 - Householder Planning Consultation/Publicity

Proposal

Erection of a rear rood dormer together with a raised roof ridge and the installation of 2 rooflights in the front roof slope (Retrospective). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Dec 2026 and 6 Jan 2027, from Hackney's recent extensions.

Site constraints 9

3 Article 4 directions
Whole of the London Borough of Hackney · Hackney Central · Exemption Area (part 2). Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Hackney APA 2.9 Roman Road (London to Great Dunmow)
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area 84 m away: Graham Road and Mapledene; Inside the Hackney built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 35 m away; Town centre 77 m away: Hackney Central.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Householder Planning
Postcode
E8 1BS
Received
4 Nov 2026
Validated
4 Nov 2026
Ward
Hackney Central Ward
Case officer
Show
Target decision
30 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
s p planning

Decision outlook

Day 14 of the 56-day target. Hackney usually decides extensions by day 56.

Day 1442 days to the 56-day target
54%decided within 8 weeks
84%approved
1,130decided in the last year

Plota live figures for extensions decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
30 Dec 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026