Beach View Holiday Park Sizewell Common Leiston Suffolk IP16 4TU Data via plota.co.uk

DC/25/4359/FUL - Full Application Approved

Proposal

Dual use of land for agricultural use and for the installation of 5 mounted solar panel arrays providing 300 solar panels and kiosk and associated development to generate electricity of Beach View Holiday Park. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Nov 2025
✓
Validated
4 Feb 2026
✓
Approved
15 Apr 2026

Approved on 15 Apr 2026 · Delegated Decision · Last checked 12 Jul 2026

Documents 32

All documents on the council site ↗

Site constraints 8

Suffolk Coast & Heaths National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Public footpath about 9 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Heritage coast: Suffolk
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 250 m away: Galloper Offshore Wind Farm
The site is about 250 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: East Anglia ONE North Offshore Windfarm (decided, about 346 m); East Anglia TWO Offshore Windfarm (decided, about 346 m); The Sizewell C Project (decided, about 410 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Special area of conservation about 194 m away: Southern North Sea
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 173 m away: Leiston - Aldeburgh SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
IP16 4TU
Received
12 Nov 2025
Validated
4 Feb 2026
Ward
Aldeburgh And Leiston
Parish
Leiston Cum Sizewell
Case officer
Show
Target decision
1 Apr 2026
Decision
Application Permitted
Decision date
15 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Wilkinson Planning Ltd

How this decision compares

Decided in 70 days from validation, 14 days slower than East Suffolk's median of 56 for agricultural works. Approved, as 67% of agricultural works here are.

55%decided within 8 weeks
67%approved
84decided in the last year

Plota live figures for agricultural works decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Consultation & key dates

Statutory expiry
1 Apr 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 overall
Relevant to this application:
Householder decisions

East Suffolk is #183 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026