Land To The East Of A970, Hill Of Wethersta, Shetland.
Pending Consideration
2026/052/PPF
Description
The erection of 2 no. wind turbines (each with an generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.