5 Hazel Grove, Clanfield, Waterlooville, Hampshire, PO8 0LE Data via plota.co.uk

EHDC-26-0242-TPO - Tree Preservation Order Approved

Proposal

T1 Oak: Crown reduce by up to approx. 2m to previous cut points. Leaving a finished height of approx. 17m, and a finished width of approx. 9m. Works required for the general maintenance of the tree, and to allow light into garden and property. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Mar 2026
✓
Approved
11 May 2026

Approved on 11 May 2026 · Delegated · Last checked 1 Oct 2026

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Radon affected area, class 2; National park about 461 m away: South Downs; Inside the Horndean built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Postcode
PO8 0LE
Received
6 Mar 2026
Validated
6 Mar 2026
Ward
Clanfield
Parish
Clanfield CP
Case officer
Show
Target decision
1 May 2026
Decision
CONSENT
Decision date
11 May 2026
Decision level
Delegated
Applicant
Show
Agent
Bailey Bros (Southern)Ltd

How this decision compares

Decided in 66 days from validation, 8 days slower than East Hampshire's median of 58 for tree and landscaping works. Approved, as 95% of tree and landscaping works here are.

46%decided within 8 weeks
95%approved
308decided in the last year

Plota live figures for tree and landscaping works decided by East Hampshire in the last twelve months, from validation. East Hampshire decision record →

Consultation & key dates

Comments by
13 Apr 2026
Statutory expiry
1 May 2026
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 councils
Relevant to this application:
Householder decisions

East Hampshire is one of the slowest councils in England for householder decisions, ranking #293 out of 296. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026