Land To The North And East Of The Gas Compressor Station Main Street Wormington Broadway Gloucestershire
Description
Proposed erection of a new Medium Combustion Plant Directive compliant gas compressor facility comprising a Compressor Acoustic Building housing compressor machinery and associated equipment, with external plant and ancillary infrastructure including pipework, vent stack, equipment rooms, control rooms, transformers, fuel gas treatment and metering equipment, fire suppression and ventilation systems, standby generator, workshops, security fencing, access, landscaping, drainage, and associated works, located to the north of the existing Wormington Compressor Station and change of use of agricultural land to National Gas Transmission operational land
Council-wide context — figures cover all householder decisions across the authority, not this specific application.
Tewkesbury is slower than most councils at deciding householder applications, ranking #194 out of 282. 51% of applications have the time limit extended, above the 40% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).