Hunters Oak Barn ,Ightenhill Park Lane,Burnley,Lancashire,BB12 0RW Data via plota.co.uk

FUL/2025/0496 - Change of use Approved

Proposal

Change of use from a residential care home (Use Class C2) to short stay holiday let accommodation (Retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2025
✓
Validated
9 Jul 2026
✓
Approved
16 Oct 2026

Approved on 16 Oct 2026 · Development Control Committee · Last checked 16 Oct 2026

Planning committee

Decided by Burnley Development Control Committee on 15 Oct 2026.

Approved

  • Officers advised approval because the proposal reuses an existing building without unacceptable countryside, amenity or highway impacts.
  • The parish council and two local representations raised concerns about noise, disturbance, traffic, coaches and neighbouring amenity.
  • The committee approved the application subject to conditions, including controls on external amplified music and noise monitoring.
Read how the committee decided The proposal, site history, officers’ assessment, objections, consultation responses, decision and conditions.

Source: Plota analysis of Burnley's committee minutes of 15 Oct 2026.

Site constraints 4

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: about 42 m from the postcode pin (reference 382434-006). 3 recorded mine entries within 50 m.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Burnley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Burnley
Application type
Change of use
Postcode
BB12 0RW
Received
26 Aug 2025
Validated
9 Jul 2026
Ward
Whittlefield with Ightenhill
Parish
Ightenhill
Case officer
Show
Target decision
3 Sept 2026
Decision
Approve
Decision date
16 Oct 2026
Decision level
Development Control Committee
Applicant
Show

How this decision compares

Decided in 99 days from validation, 47 days slower than Burnley's median of 52 for changes of use. Approved, as 73% of changes of use here are.

80%decided within 8 weeks
73%approved
57decided in the last year

Plota live figures for changes of use decided by Burnley in the last twelve months, from validation. Burnley decision record →

Public comments

No public comments yet.

Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
28 Aug 2026
Committee
15 Oct 2026
Burnley
Planning Authority Score
5/10
Average
#145 of 296 councils
Relevant to this application:
Change of use

Burnley ranks #113 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Burnley decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #148 of 296
90%
Householder approved
Above avg (90%) #187 of 296
71%
Decided in 8 weeks
Above avg (63%) #113 of 296
40%
Extended time limit
Below avg (41%) #149 of 296
73%
Minor dwellings approved
30 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
82%
Change of use approved
22 decided
294
Total decisions
36 refused in the year to March 2026