52 The Green Southall UB2 4BQ Data via plota.co.uk

261610FUL - Full Application Pending Consideration

Proposal

Construction of a mixed-use six-storey building comprising of Housing in Multiple Occupation (Sui-Generis Use Class) and Commercial Space (Use Class E) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Apr 2026
✓
Consultation
7 Sept 2026
Decision
Expected by 11 Jun 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 21 Sept 2026; it is now day 176.

The consultation period closed on 21 Sept 2026.

Documents 27

All documents on the council site ↗

Site constraints 7

Archaeological priority area: Medieval settlement of Southall.
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1718 m away: M4 Junctions 3 to 12 Smart Motorway; 1 listed building within 150 m; Inside the Ealing built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
UB2 4BQ
Received
16 Apr 2026
Validated
16 Apr 2026
Ward
Southall Green
Case officer
Show
Target decision
11 Jun 2026
Applicant
Show
Agent
Agenda 21 Architects Studio Ltd

Decision outlook

Day 176, past the statutory target. 83% of changes of use in Ealing are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 6 Oct 2026.

Day 176120 days past the 56-day target
50%decided within 8 weeks
51%approved
185decided in the last year

Plota live figures for changes of use decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

1,980comments received
1,474 objecting9 neutral497 supporting

74% object · in line with the UK average

Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14845027
Planning Portal ref
PP-14845027
Consultation
7 Sept 2026
Comments by
21 Sept 2026
Statutory expiry
11 Jun 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use