1-3 Featherstone Road Southall UB2 5AA Data via plota.co.uk

Proposal

Construction of a second floor and third floor mansard roof extension with terrace areas including a three storey rear extension (following demolition of existing storage) including conversion of part existing ground floor retail (Use class E) to residential unit (Use class C3); associated cycle and refuse storage; existing three retail units at ground floor level Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
15 Oct 2025
✓
Validated
20 Jan 2026
✓
Consultation
20 Jan 2026
✗
Refused
6 Mar 2026
Appeal
Not lodged

Refused on 6 Mar 2026 · Delegated Decision · Last checked 7 Jul 2026

Site constraints 7

Archaeological priority area: Medieval settlement of Southall.
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1.5 km away: M4 Junctions 3 to 12 Smart Motorway; 2 listed buildings within 150 m; Inside the Ealing built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
UB2 5AA
Received
15 Oct 2025
Validated
20 Jan 2026
Ward
Southall Green
Case officer
Show
Target decision
17 Mar 2026
Decision
Refused
Decision date
6 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
AH Architecture

How this decision compares

Decided in 45 days from validation, 14 days faster than Ealing's median of 59 for changes of use. Refused, as 46% of changes of use here are.

47%decided within 8 weeks
54%approved
210decided in the last year

Plota live figures for changes of use decided by Ealing in the last twelve months, from validation. Ealing decision record →

Consultation & key dates

Alt. reference
PP-14412361
Planning Portal ref
PP-14412361
Consultation
20 Jan 2026
Comments by
12 Feb 2026
Statutory expiry
17 Mar 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026