1-7 Leyden Street, London, E1 7LE Data via plota.co.uk

PA/26/00845/A1 - Full Planning Permission Registered

Proposal

Change of use of the first, second and third floors of 5 Leyden Street from ancillary storage associated with the ground floor wholesale use (Use Class B8) to form one 2-bedroom, 3-person residential unit (Use Class C3). Associated reconfiguration of internal access via 3 Leyden Street to provide access to the first floor of 5 Leyden Street. Construction of a winter garden at roof level to the rear of 5 Leyden Street. Provision of cycle storage, refuse storage, and associated amenity space to the rear of 1 Leyden Street. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Jun 2026
✓
Consultation
9 Jun 2026
Decision
Expected by 16 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 128.

The consultation period closed on 14 Jul 2026.

Site constraints 11

Wentworth Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Heritage at risk: Wentworth Street, Bethnal Green
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Archaeological priority area: Tower Hamlets APA 2.12
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project 753 m away: Thames Tideway Tunnel
The site is 753 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 281 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
5 listed buildings within 150 m; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 10 m away: Wentworth Street.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E1 7LE
Received
3 Jun 2026
Validated
3 Jun 2026
Ward
Spitalfields and Banglatown
Case officer
Show
Target decision
16 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Cityshaping Ltd

Decision outlook

Day 128, past the statutory target. 87% of changes of use in Tower Hamlets are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Oct 2026.

Day 12872 days past the 56-day target
66%decided within 8 weeks
55%approved
52decided in the last year

Plota live figures for changes of use decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
9 Jun 2026
Consultation
9 Jun 2026
Comments by
14 Jul 2026
Site or press notice
23 Jun 2026
Statutory expiry
7 Jul 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Change of use

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026