68 Manning Avenue Christchurch BH23 4PW Data via plota.co.uk

P/26/05659/TTPO - Tree work to tree/s subject to a TPO Registered - Awaiting Allocation

Proposal

T1 - Lime - Raise crown to approx 6m to clear properties and power lines, thin regrowth from historic pruning by approx 20% to reduce sail area and increase light through crown Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Nov 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 14 Jan 2027 and 21 Jan 2027, from BCP's recent tree and landscaping works.

Site constraints 7

Article 4 direction
Hovercraft in the Solent. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project 424 m away: Navitus Bay Wind Park
The site is 424 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Conservation area 19 m away: Verno Lane
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
National park 454 m away: New Forest; Inside the Christchurch (Bournemouth, Christchurch and Poole) built-up area; Priority habitat 20 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 4

Last sold for £625,000 in July 2024. Detached house, freehold.

29 July 2024£625,000
25 March 2020£440,000
19 June 1998£163,950
1 August 1995£135,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area138 m² (1,485 sq ft)
Energy ratingD (67 out of 100), could reach C
PropertyDetached bungalow, 6 habitable rooms
Built1976 to 1982
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in February 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Tree work to tree/s subject to a TPO
Postcode
BH23 4PW
Received
19 Nov 2026
Validated
19 Nov 2026
Ward
Highcliffe & Walkford, Mudeford, Stanpit & West Highcliffe
Parish
Highcliffe & Walkford Parish Council
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Hedgeman

Decision outlook

Day 4 of the 56-day target. BCP usually decides tree and landscaping works by day 60.

Day 456 days to the predicted decision (day 60)
40%decided within 8 weeks
95%approved
2,276decided in the last year

Plota live figures for tree and landscaping works decided by BCP in the last twelve months, from validation. BCP decision record →

BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 overall
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications: #256 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.