SPRING GARDENS HOLIDAY PARK The Roe, St Asaph, Denbighshire, LL17 0HY Data via plota.co.uk

46/2025/0557/MD - Major Development Pending Consideration

Proposal

Estyniad i safle carafanau presennol a chreu 68 o seiliau ychwanegol ar gyfer carafanau statig, estyniad i ffordd fynediad fewnol gan gynnwys gosod bollardau cloadwy i atal mynediad i Ffordd Y Bryn, uwchraddio system draenio dwr wyneb a dwr budr a thirlunio cysylltiedig a gwella bioamrywiaeth / Extension to existing caravan site and creation of 68 additional bases for static caravans, extension to internal access road including installation of lockable bollards to prevent access to Mount Road, upgrade of surface water and foul drainage system and associated landscaping and biodiversity enhancement Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
week of 24 Nov 2025
✓
Validated
25 Nov 2025
Decision
Expected by 24 Feb 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 318.

Documents 32

Plans & drawings 20

PDF Chamber Schedule (Drawing No. 518-006 P01) DM Plans · 16 Dec 2025 View ↗ PDF Proposed Areas Plan (Drawing No. 518-004 P02) DM Plans · 16 Dec 2025 View ↗ PDF Existing Areas Plan (Drawing No. 518-003 P01) DM Plans · 16 Dec 2025 View ↗ PDF Trial Pit Location Plan (Drawing No. 518-002 P01) DM Plans · 16 Dec 2025 View ↗ PDF Location Plan (Drawing No. 518-001 P03) DM Plans · 16 Dec 2025 View ↗ PDF Hydrobrake Construction Detail (Drawing No. 017 P01) DM Plans · 16 Dec 2025 View ↗ PDF Surface Finishes Kerbing Layout (Drawing No. 014 P01) DM Plans · 16 Dec 2025 View ↗ PDF Infiltration Testing Report (Drawing No. 518-R1-P01) DM Plans · 16 Dec 2025 View ↗ PDF Proposed Site Layout (Drawing No. 518-021-P01) DM Plans · 16 Dec 2025 View ↗ PDF Removable Bollard GA (Drawing No. 518-020-P03) DM Plans · 16 Dec 2025 View ↗ PDF Proposed basin layout (Drawing No. 518-018-P01) DM Plans · 16 Dec 2025 View ↗ PDF Track Longsections Sheet 2 (Drawing No. 518-016-P01) DM Plans · 16 Dec 2025 View ↗ PDF Track Longsections Sheet 1 (Drawing No. 518-015-P01) DM Plans · 16 Dec 2025 View ↗ PDF Surface finishes and kerbing layout (Drawing No. 518-014-P02) DM Plans · 16 Dec 2025 View ↗ PDF Track Setting Out Tables (Drawing No. 518-013-P01) DM Plans · 16 Dec 2025 View ↗ PDF Track Setting Out Layout (Drawing No. 518-012-P01) DM Plans · 16 Dec 2025 View ↗ PDF Construction Details (Drawing No. 518-011-P01) DM Plans · 16 Dec 2025 View ↗ PDF Proposed external levels (Drawing No. 518-010-P02) DM Plans · 16 Dec 2025 View ↗ PDF Landscaping Sheet 1 (Drawing No. MH-130-03) DM Plans · 16 Dec 2025 View ↗ PDF Landscaping Sheet 2 (Drawing No. MH-130-05) DM Plans · 16 Dec 2025 View ↗

All documents on the council site ↗

Site constraints 5

2 listed buildings within 150 m of the postcode pin
Nearest: Gwernigron Farmhouse, Grade II, about 1 m from the postcode pin · 1 Grade II*, 1 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 788 m away: Awel y Môr Offshore Wind Farm
The site is about 788 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Mona Offshore Wind Farm (decided, about 1285 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2.
Not affected
No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Denbighshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Major Development
Postcode
LL17 0HY
Received
week of 24 Nov 2025
Validated
25 Nov 2025
Ward
WD29 - St Asaph East
Parish
St. Asaph CC (46)
Case officer
Show
Target decision
24 Feb 2026
Applicant
Show
Agent
Cadnant Planning

Decision outlook

Day 318, past the statutory target. 46% of commercial premises in Denbighshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 318262 days past the 56-day target
29%decided within 8 weeks
87%approved
10%go to committee

Plota live figures for commercial premises decided by Denbighshire in the last twelve months, from validation. Denbighshire decision record →

Consultation & key dates

Statutory expiry
24 Feb 2026