Development Land South West Of Goole Road West Cowick East Riding Of Yorkshire DN14 9TL Data via plota.co.uk

26/30457/CONDET - Approval of Details req'd by Condition Decided

Proposal

Confirmation that all conditions have been approved for planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Sept 2026
✓
Enquiry Answered
15 Sept 2026

Enquiry Answered on 15 Sept 2026 · Delegated Decision · Last checked 24 Sept 2026

Site constraints 4

Agricultural land, grade 2, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Leeds). Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
National infrastructure project 978 m away: Thorpe Marsh Gas Pipeline
The site is 978 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Yorkshire and Humber CCS Cross Country Pipeline (decided, 1878 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1168 m); Humber Carbon Capture Pipeline (at pre-application, 1919 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; Inside the Snaith built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details req'd by Condition
Postcode
DN14 9TL
Received
14 Sept 2026
Validated
14 Sept 2026
Ward
Snaith, Airmyn & Rawcliffe & Marshland
Parish
Snaith And Cowick Town Council
Case officer
Show
Target decision
9 Nov 2026
Decision
Enquiry Answered
Decision date
15 Sept 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Leading Property Lawyers

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15214889
Planning Portal ref
PP-15214889
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026