Community football facility at Worthing
Summary of planning committee decision
Decided by Worthing Adur Planning Committee on 1 Jun 2026.
What was proposed
The application sought changes to the approved pitch, clubhouse and ground levels, including a smaller building, relocated entrance and two access ramps.
“Proposal: Application to Vary Conditions 1 (Approved Plans) and 22 (levels) of previously approved AWDM/1217/23. Amendments: Repositioning of pitch; reduction in clubhouse size and alterations including relocation of main entrance; formation levels change and two new access ramps ORIGINAL DESCRIPTION: Redevelopment of the Former Southwick Football Club, comprising the replacement of existing turf pitch with 3G pitch and replacement floodlights, demolition of existing…”
Officer report
The site and surroundings
The former football club site lies beside recreation, leisure and residential areas, with a railway line to the south and a footpath along its eastern boundary.
“The application relates to the site of the former Southwick Football Club which is off Old Barn Way to the east of Southwick Recreation Ground and the indoor bowling green and to the south west of Southwick Leisure Centre. There is a motorcycle training facility directly to the north with the leisure centre car park beyond that. There are residential houses further to the north and to the east. To the south is the south coast railway line.”
Officer report
Earlier permission and site history
Permission was granted in 2024 for a 3G pitch, clubhouse, floodlights, spectator stand and related works, after the former clubhouse was demolished.
“Planning permission was granted in October 2024 for the demolition of the derelict clubhouse on the east side of the site and the construction of a new single storey clubhouse with changing rooms, bar, kitchen and a flexible space for health/wellbeing uses in broadly the same location.”
“The Planning Permission of 2024 was also subject to a s.106 Unilateral Planning Obligation upon the application. This requires their implementation of a travel plan, the appointment of a travel plan coordinator and the payment of an associated monitoring fee.”
Officer report
Why the design changed
Underground cables and a sewer required the pitch to move north, reducing the clubhouse footprint and creating level differences addressed by two ramps.
“During detailed design development it became clear that the originally approved clubhouse building footprint could not be accommodated following the need to alter the pitch position. The pitch position has been forced to move slightly further north following the discovery of both a high voltage cable and a Southern Water sewer in the South East corner of the existing playing surface.”
“Other changes have arisen as a result of a difference in ground level between the clubhouse and the pitch of almost 1m. A ramp has therefore been incorporated connecting the site entrance at footpath level with the pitch level. A second ramp is also proposed to provide dedicated access for players between the clubhouse and the pitch.”
Officer report
Consultation responses
Highways, environmental health, Southern Water and Sport England raised no objections, while Network Rail noted underground cables and the flood authority sought drainage details.
“Network Rail: Please note there are HV underground cables on the site running within close proximity to the proposed development. Prior to commencement of work accurate records should be obtained.”
“Based on this response, Sport England raises no objection to application to vary conditions 1 (Approved Plans), 22 (levels) and 26 (surface water drainage) of previously approved AWDM/1217/23 on the basis of implementation in line with the submitted details.”
Officer report
Resident concerns
One comment raised concerns about speeding, increased traffic and the effects of more cars and a clubhouse involving alcohol.
“We already have a huge issue with speeding cars going to/from the leisure centre. How is this going to be managed with more cars and the addition of a clubhouse that will involve alcohol? I suggest speed bumps and a reduction to the speed limit to 20mph. Traffic increase will be a problem…”
Officer report
Supporters’ representations
Two supporters described wider health, wellbeing and community uses, local walking access, public transport signposting and community-led plans.
Members’ discussion
Members considered the project beneficial for the community and found the variation understandable after hearing about the design constraints.
“Members concurred that this was a good project for the community and the variation was understandable. A proposal was put forward to accept the Officers recommendation and approve the application. This was seconded and voted in favour of unanimously.”
Minutes
The decision
The application was approved subject to completing a deed of variation securing travel plan monitoring and a £3,815 fee, together with the conditions.
“Subject to the completion of a Deed of variation to the original s106 Agreement to secure Travel Plan Monitoring and a Fee of £3815, and the following conditions:-”
Minutes
Councillors at the meeting
- Dan FlowerChairLabour
- Gerry ThompsonVice-ChairGreen
- Carolyn FuhrmannLabour
- Andrew HarveyDeclared an interestLabour
- Carol AlburyIndependent
- Mike MendozaReform UK
- Joe PannellReform UK
- Robina BaineSubstitute for Pauline HigginsLabour
- Debs StainforthSubstituteLabour
Absent Pauline Higgins Labour, Kate Davis Labour
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Worthing Adur Planning Committee minutes, 1 June 2026
- Agenda and papers (council website)
Source: Plota analysis of Worthing's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Worthing Adur Planning Committee
- Council
- Worthing
- Date
- Monday 1 June 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- Unanimous
- Councillors
- 9Labour 5Reform UK 2Independent 1Green 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- All decisions
- Worthing committee decisions →
This committee's year
16 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.