Industrial employment building at Hawkhurst Station Business Park, Gill's Green, Cranbrook
Summary of planning committee decision
Decided by Tunbridge Wells Planning Committee on 30 Sept 2026.
What was proposed
The application proposed a 3,185-square-metre, one-storey Class B2 employment building with parking, service bays, access and associated works.
“Proposed Site Area (excluding existing access route) 1.67ha Land use(s) and floor area(s) 3,185m 2 B2 (General Industrial) Number of jobs 60: 40 full-time; 20 part-time (50 full-time equivalent) Car parking spaces 54 (6 disabled) Disabled car spaces 6 Service vehicle spaces 3 Bays (with parking for 10 HGVs) Cycle spaces 19 Number of storeys 1 Max eaves height 6m at southern bay 5.4m and 6.4m at southern and northern ends of main building Max height 6.95m at southern end 8.8m…”
Officer report
Site and design changes
The building would be south of the existing business park, with its height, length and footprint reduced after the earlier committee deferral.
“The application relates to the proposal to erect an employment building in B2 use south of Hawkhurst Station Business Park. Following the 19.08.26 Committee meeting where the case was deferred for further discussions to take place with the applicant regarding design and scale of the proposed development.”
“The following amendments have been made: • Height of the building reduced by 1.2m across the southern 2/3rds of the building • Building length has reduced by 1m • Height has decreased from 8.15m to 6.95m • Footprint of building reduced by 4.5m at the southern end with the removal of 1 off-loading bay.”
Officer report
Earlier committee consideration
The application was deferred on 19 August 2026 for further discussions about the building’s design and scale.
“This report follows the motion to defer the application at the 19 August 2026 Planning Committee, pending further discussions regarding the design and scale of the proposed development. The amendments are discussed in this report including…”
Officer report
Design, landscape and drainage
Officers considered the reduced building and proposed landscaping acceptable, while the revised drainage strategy would retain rainwater within the site subject to conditions.
“Following the 19.08.26 Committee meeting, the footprint of the proposed building has reduced by 4.5m at the southern end with the removal of 1 off-loading bay. Overall, as shown on the site plan overlay with the allocation buffers (below), 97.7% of the footprint is now within the identified area for employment use with only 2.3% located within the landscape buffer.”
“Regarding landscaping, concern had been raised by Members regarding the level of landscaping at the northern end of the site. The Landscape Masterplan has been superseded by the updated site plan, although the previous submission indicated that a sufficient level of landscaping could be provided at the northern end of the site to provide an acceptable level of screening and noise attenuation. While superseded, an updated Landscape Masterplan is required by a condition.”
Officer report
Concerns raised
One objection raised concerns about cumulative development, noise, visual impact, HGV movements, drainage, water supply, screening and building orientation.
“Additional dense native planting should be conditioned to provide screening to the southern lower area. • Re-orientation of building would reduce visual impact from Slip Mill Lane and to nearby properties, and would minimise breaking into landscape buffer. • Insufficient drainage for both foul waste; storm water drainage unviable. Potable water supply is unviable. Waste water systems insufficient; tanker empties facilities daily and is very noisy.”
Officer report
Who spoke
No speakers addressed the committee because the application followed the deferred application procedure.
What members discussed
Members discussed the site allocation, reduced scale, drainage, landscape and employment benefits, while noting that refusal without clear reasons could lead to an appeal.
“- Members were reminded the site was allocated for employment use in the Local Plan. - The proposed height of the building was in keeping with existing surrounding buildings and met expectations as part of the landscape assessment. - Proposed height was 6.95m, similar to the height of a two-storey house. - Indicative images showed how woodland would screen the view of the proposed structure over a period of time, therefore reducing visual impact.”
“- Officers had taken away comments from the previous committee and sought to resolve matters of concern relating to scale of the design, which they were satisfied had taken place. - It was reiterated that the site was allocated as an employment site, and therefore expectation was present that some form of industrial building would be delivered. - Members were mindful that rejecting the application without clear reason could result in an appeal.”
Minutes
The committee vote
Members voted to approve the application by four votes to three, with two abstentions.
“Decision/voting – On the basis that members were satisfied that all relevant planning considerations had been covered within the report, a motion was proposed by Councillor Obasi, seconded by Councillor Barrass and a vote was taken to approve the application in line with the recommendation.”
Minutes
The decision
The application was granted subject to a legal agreement securing contributions, reptile measures and biodiversity monitoring, together with the listed conditions.
“- KCC Sustainable Transport Contribution (£36,551). - HPLHG Contribution (£6,000). - A reptile translocation/receptor site following agreement, subject to management and monitoring over 5 years. - Monitoring of on-site BNG for 30 years.”
Minutes
Councillors at the meeting
- Hugh PattersonChairLib Dem
- Lynne DarrahVice-ChairConservative
- Ellen NevilleTunbridge Wells Alliance
- Gavin BarrassLib Dem
- Richard BrownLib Dem
- Tom DawlingsConservative
- Christopher DigbyLib Dem
- Ukonu ObasiLib Dem
- Kimberley JohnsonLib Dem
Proposed by Councillor Ukonu Obasi, seconded by Councillor Gavin Barrass.
Apologies Don Kent Lib Dem, Hugo Pound Labour
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Tunbridge Wells Planning Committee minutes, 30 September 2026
- Agenda and papers (council website)
Source: Plota analysis of Tunbridge Wells's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Tunbridge Wells Planning Committee
- Council
- Tunbridge Wells
- Date
- Wednesday 30 September 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Councillors
- 9Lib Dem 6Conservative 2Tunbridge Wells Alliance 1Show councillors
- Public speakers
- None
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- Tunbridge Wells committee decisions →
This committee's year
35 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.