Changes to 164-home scheme at Land At Llantarnam Adjacent To Malthouse Lane, Llantarnam
Summary of planning committee decision
Decided by Torfaen Planning Committee on 10 Nov 2026.
What was proposed
The application sought changes to approved plans and conditions covering layout, drainage, surface water outfall, street furniture and highway infrastructure.
“This application seeks to Vary conditions 1 (approved plans), 12 (surface water outfall), 13 (surface water), 16 (street furniture and highways infrastructure) of Application Reference Number: 18/P/0424/RES. The changes to the approved plans listed in condition 1 of the reserved matters permission can be summarised as follows:”
“APPLICATION NUMBER – 24/P/0485/VAR REPORT • The siting of the residential units has marginally changed. The greatest variation relates to plots 15, 16 and 17; • The finished levels have changed which has resulted in a number of retaining walls being altered. • The children’s play area accessed from the footpath link on Newport Road and the turning head adjacent to Plot 8 are intended to be altered (these would be raised by approx.”
Officer report
The site and development
The site is a developed former farmland scheme of three phases, with phases one and two largely occupied and phase three under construction.
“The application site is former farmland that has been developed with 1,2,3,4 and 5-bedroom properties. The site is accessed off Newport Road by a new signalled controlled junction and along the diverted Malthouse Lane.”
“To the east of the site, beyond a noise attenuation bund, is the A4042 dual carriageway. A public right of way (419/27/1) is also located along this boundary. To the south, and slightly elevated above the site, is Lansdowne Gardens. This is partially screened from the site by an existing woodland. To the north, and at a lower level than the application site, is the Grade II listed Magna Porta lodge, walls and railing that lead to the wider Abbey Wood estate.”
Officer report
Planning history
Earlier permissions covered a strategic mixed-use development and reserved matters for 164 homes, roads and infrastructure.
“Outline application for the development of land at Llantarnam for employment(B1), residential (C3), a neighbourhood centre…”
“Application for reserved matters approval (access, appearance, landscaping, layout and scale) in respect of 164 dwellings including roads and infrastructure…”
Officer report
The officer recommendation
Officers recommended approval after a deed of variation, subject to conditions, because the amended scheme was considered acceptable overall.
“It is considered that the assessment and conclusions are fair and accurate and that the environmental impacts have already been considered and that this submission would be not result in any environmental impact beyond those considered.”
“RECOMMENDATION: Upon completion of a Deed of Variation, under Section 106 of the Town and Country Planning Act 1990, concerning the matters referred to in the above report, the Group Leader (Development Management) be authorised to grant permission subject to the following conditions or any amendments additions or deletions of these conditions he may deem necessary.”
Officer report
Consultation responses
Most consultees raised no objection, while highways officers identified four outstanding accessibility or highway matters to be resolved by condition.
“Highways And Transportation The Highway Authority notes that this is the third iteration of the current variation application. Whilst it is acknowledged that a number of previously raised concerns have been addressed by the developer prior to this resubmission, several outstanding matters remain which require further consideration before the development can be considered fully acceptable from a highway and accessibility perspective.”
“Given that the development is substantially complete and recognising the progress made since previous submissions, the Highway Authority raises no objection subject to the imposition of a suitably worded planning condition requiring the outstanding highway details and any necessary remedial works to be submitted for approval and implemented within a short and defined timescale.”
Officer report
Residents’ objections
Thirty-seven residents objected, raising concerns about levels, retaining walls, roads, unfinished works, construction impacts, drainage, traffic and the playground.
“The proposed siting of the houses and levels are not as approved. • The retaining walls are higher than approved and affect the amenity of residents. • The proposed roads are insufficient to allow traffic through, and this has led to damage of curb paving. • The boundary wall at number 27 is higher than approved. • There is an objection to the loss of land at 28 for the proposed footpath.”
“APPLICATION NUMBER – 24/P/0485/VAR REPORT • Do not want the developer to erect the chimneys or make other alterations to their properties given the quality of the workmanship. • Concern is raised in relation to the speed of the cars using Malthouse Lane and exiting the site.”
Officer report
The main planning issues
The assessment found the changes acceptable in design, heritage, biodiversity, residential amenity, highways, drainage, playground access and site maintenance terms.
“In terms of the material changes that have taken place, it is considered that the application proposes an acceptable development which meets the design principles set out in the previous approval. Taking all the above into account, the application is considered acceptable in terms of design, layout and overall placemaking principles.”
“Maintenance The submitted Site Management Plan (reference P.07) identifies the management and maintenance responsibilities for the development site. In essence the green areas would be managed/maintained by the management company with the roads adopted by the highways authority. The swales that will take highway surface water run-off would be maintained by the highways authority.”
Officer report
The committee decision
The committee authorised permission after completion of a deed of variation, with nine members voting in favour and one against.
“24/P/0485/VAR Members agreed with 9 voting in favour and 1 voting against that upon completion of a Deed of Variation, under Section 106 of the Town and Country Planning Act 1990, concerning the matters referred to in the report, that the Group Leader (Development Management) be authorised to grant permission subject to the conditions laid out in the report or any amendments additions or deletions of the conditions he may deem necessary. 6 Planning Application -”
Minutes
Councillors at the meeting
- Norma ParrishChairLabour
- Stuart AshleyLabour
- Steven EvansLabour
- Karl GaudenLabour
- Jon HorlorLabour
- Gaynor JamesLabour
- Jon JamesLabour
- Janet JonesIndependent
- Mark JonesIndependent
- Alan SladeReform UK
- Chris TewIndependent
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Torfaen Planning Committee minutes, 10 November 2026
- Agenda and papers (council website)
Source: Plota analysis of Torfaen's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Torfaen Planning Committee
- Council
- Torfaen
- Date
- Tuesday 10 November 2026
- Committee decided
- Approved
- Councillors
- 11Labour 7Independent 2Reform UK 1Independent 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- Torfaen committee decisions →
This committee's year
8 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.