Solar farm at Land At Epney, Framilode, Gloucester
Summary of planning committee decision
Decided by Stroud Development Control Committee on 2 Dec 2025.
No officer report was published for this decision; this summary is from the committee minutes.
A large solar farm
The application is for a solar farm of up to 49.5 megawatts, with a substation, grid connection compound and a 40-year temporary permission.
“The Senior Planning Officer (Majors) introduced the report and highlighted the following: • The proposed development consisted of a solar farm with an output of up to 49.5MW. • The solar arrays faced south and had a maximum height of 3m with inverters in between them. • The substation and distribution network operator (DNO) building were enclosed with fencing and the grid connection compound.”
Minutes
Officers set out several reasons to refuse
Officers said the biodiversity baseline had not been agreed, only one year of required bird surveys had been submitted, and highways had objected to the single access route, each forming a reason for refusal.
“Two years’ worth of overwintering bird surveys were requested for a Habitats Regulations Assessment (HRA), however, only one years’ worth was received resulting in another reason for refusal. • A shadow HRA wasn’t provided and therefore Natural England could not be consulted.”
“Another reason for refusal was due to highway safety, GCC highways had objected to the applicant’s proposal as it was via a single access route which hadn’t been addressed. • The site access route conflicted with footpaths within the area. The applicant had addressed some of the issues, however, in some areas the drawings were incorrect, or the impact of construction vehicles wasn’t assessed.”
Minutes
The Ward Member presses for refusal
The Ward Member said the development would harm a canal heritage site, that the access roads and a weight-limited bridge could not take construction traffic, and that the area already had enough solar development.
Parish councils and a resident object
Parish councillors and a resident raised flood risk, harm to wildlife habitats, unsuitable country lanes for construction vehicles, and loss of productive farmland, while a petition showed strong local opposition.
“The parish was overwhelmingly opposed to the proposal, an informal community ballot held in June showed 99% opposed the development and asked the parish council to fight it. • The parish supported renewable energy however it could not support an industrial scale development in the wrong location.”
“The narrow country lanes were used daily by a wide mix of farm vehicles and vulnerable users and the lanes were not intended for heavy construction vehicles. • There was a flood risk, and the fields were vital as a natural floodplain. The Local Plan and NPPF required new developments to not increase flood risk elsewhere.”
Minutes
The landowner and applicant's agent respond
The landowner said solar income would secure the family farm's future, while the applicant's representative said most objections were procedural and based on evidence not accepted during determination.
Officers answer members' questions
Officers confirmed the council's lawyer advised against approving without the required habitat assessment, and that flooding, highways and construction traffic issues remained unresolved.
“In response to Councillor Luff’s question, the Lawyer advised it would not be wise to approve the application due to the lack of HRA and there would be a strong likelihood of challenge if the application were approved without appropriate assessment.”
“In response to Councillor Callinan, the Senior Planning Officer (Majors) explained the construction traffic management plan showed there would be one non-standard delivery vehicle of a flatbed truck which was assumed to be for the transformer. There were no details given on the type or dimensions of the transformer transport; these details were normally left to the design stage.”
Minutes
Refused unanimously
Members agreed flooding, transport and insufficient evidence meant the application could not be supported, and the motion to refuse was carried unanimously.
“Councillor Shannon advised she would be voting for refusal due to the issues with flooding and transport elements.”
“After being put to the vote, the Motion was carried unanimously.”
Minutes
Sources
- Stroud Development Control Committee minutes, 2 December 2025
- Agenda and papers (council website)
Source: Plota analysis of Stroud's committee minutes. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Stroud Development Control Committee
- Council
- Stroud
- Date
- Tuesday 2 December 2025
- Committee decided
- Refused
- Vote
- Unanimous
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- Stroud committee decisions →