Five-turbine wind farm at Hawkwood Wind Farm Kype Highway, Strathaven
Summary of planning committee decision
Decided by South Lanarkshire Planning Committee on 12 May 2026.
What was proposed
The application proposed five wind turbines, associated infrastructure and access, with four turbines up to 200 metres and one up to 180 metres.
“Description of Proposed Development 3.1. The planning application seeks detailed consent for a wind farm made up of 5 turbines (each with a generating capacity of up to 6.6 MW) and associated infrastructure. Four of the proposed turbines would have a maximum height to blade tip of 200m, with the final turbine having a maximum height to blade tip of 180m.”
“One site access is proposed in the west of the site which utilises an existing access associated with Burnside Farm, located adjacent to the western portion of the site boundary. All vehicles accessing the proposed development, such as HGVs and Abnormal Loads, would travel along Muirkirk Road (the B743) and turn southeast onto the main site access track. The existing access track would be upgraded including the widening of the bellmouth at the site entrance.”
Officer report
The site and surroundings
The site covers about 224.2 hectares of open moorland near Strathaven, with nearby homes, existing wind farms, watercourses and protected areas.
“Site Description 2.1. The application site is located to the south and eastern sides of Hawkwood Hill, within an area of open moorland, and is situated approximately 9.1 km to the north of Muirkirk, 6.1 km south-west of Strathaven and approximately 1.2 km east of Dungavel. The site covers an area of approximately 224.2 ha.”
“There are no residential properties located within the site, however, Burnside Farm lies adjacent to the portion of the site boundary which includes the proposed site access track. This property is located approximately 1.73 km northwest of the closest proposed turbine, T2. Several other residential properties lie between the northern/northeastern site boundary and the B743 public highway.”
Officer report
Earlier application history
The proposal was subject to formal pre-application consultation under reference P/23/0002/PAN.
“Relevant Planning History 4.1. The proposed development was the subject of formal Pre-Application Consultation, progressed under the terms of Proposal of Application reference P/23/0002/PAN.”
Officer report
What officers recommended
Officers recommended permission because the development supported renewable energy objectives and was considered acceptable subject to conditions and a legal agreement.
“In terms of the adopted South Lanarkshire Local Development Plan 2, Policy 18: Renewable Energy states that applications for renewable energy infrastructure developments will be supported subject to an assessment against the relevant criteria and requirements set out in the Assessment Checklist for Renewable Energy Proposals found in Policy RE1 Renewable Energy.”
“Conclusion In conclusion, a full assessment of the proposals against the development plan (consisting of both NPF4 and South Lanarkshire Local Development Plan 2) has been carried out. NPF4 Policy 1 directs decision makers to give significant weight to the global emergency crisis. Furthermore, Policy 11 states that proposals for renewable energy that contribute to renewable energy generation targets should be supported.”
Officer report
Main effects considered
The assessment considered landscape, homes, noise, nature, heritage, recreation, aviation, roads and the proposed grid connection.
“A Landscape and Visual Impact Assessment (LVIA) forms part of the EIA submitted with the application. The site is within the Plateau Moorlands – Glasgow and Clyde Valley Landscape Character Type (LCT) the key characteristics of which include a large-scale landform, extensive windfarm development and a distinctive upland character formed by the plateau landform and moorland vegetation.”
“Grid connection A recent judgement made by the Court of Session in respect of a proposal for a windfarm in the Scottish Borders found that the windfarm and the associated grid connection should be treated as a single project for the purposes of the Environmental Impact Assessment required rather than as separate entities.”
Officer report
What consultees said
Most consultees raised no objection, while the community council objected over cumulative, landscape and residential effects and Strathaven Airfield raised aviation safety concerns.
“Sandford and Upper Avon Community Council – objects to the proposed development on grounds relating to cumulative impact, landscape impact and impact on local residents. Response: The points raised are assessed within Section 10 of this report.”
“Strathaven Airfield – have submitted a holding objection to the proposed development on the grounds of aviation safety while awaiting detailed mapping to be provided.”
Officer report
What people said
There were 135 representations: 83 objections and 52 supporting comments, covering cumulative effects, flicker, lighting, health, noise, ecology, property values and roads.
“Representations 7.1. At the time of writing, a total of 135 representations have been submitted in respect of the proposed development, 83 of which note an objection to the proposed development with the remining 52 being in support of the proposed development. Further publicity was carried out following the submission of the addendum to the EIA and no further representations have been received in response.”
“Adverse cumulative impact • Shadow flicker • Adverse impact associated with aviation lighting • Health and safety concerns • Noise impact • Adverse ecological impacts • Adverse impacts on property values • Impact on local road network…”
Officer report
The committee’s decision
The committee granted planning permission subject to the report’s conditions and completion of a Section 75 Agreement or another appropriate agreement.
“The Committee decided: that planning application P/24/1420 by Wilson Renewables IV LLP for the erection and operation of a wind farm consisting of 5 turbines with a maximum height to blade tip of 200 metres, with associated infrastructure and access at land at Hawkwood Hill, B743 Kype Highway, Strathaven be granted subject to:-”
“the conditions specified in the Executive Director’s report • the conclusion of a Section 75 Agreement and/or other appropriate agreement between the Council, site owner(s) and the applicant…”
Minutes
Sources
- South Lanarkshire Planning Committee minutes, 12 May 2026
- Agenda and papers (council website)
Source: Plota analysis of South Lanarkshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- South Lanarkshire Planning Committee
- Council
- South Lanarkshire
- Date
- Tuesday 12 May 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- South Lanarkshire committee decisions →
This committee's year
42 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.