Church roof improvements at St Johns Church, Station Road, Waterbeach
Summary of planning committee decision
Decided by South Cambridgeshire Planning Committee on 10 Sept 2025.
What was proposed
The application proposed re-roofing the church’s flat-roof extension, adding insulation and a sedum finish, and installing an underground rainwater tank and drainage.
“Report contents Document section Document heading 1 Executive summary 2 Site description and context 3 The proposal 4 Relevant site history 5 Policy 6 Consultations 7 Third party representations 8 Member representations 9 Assessment 10 Design, layout, scale and landscaping 11 Heritage assets 12 Amenity 13 Planning Balance 14 Recommendations 15 Planning Conditions and Informatives Table 1 Contents of report 1.”
“The proposal 3.1 The application seeks planning permission for re-roofing of an existing 1970s flat roof extension, with added insulation, sedum roof finish and the installation of an underground water tank, together with a rainwater harvesting.”
Officer report
The site and surroundings
The site is a Grade II* listed church in the conservation area, with residential properties nearby and part of the rear site in green belt land.
“The site forms St. John The Evangelist Church in Waterbeach, which is a Grade II* Listed Building. The church falls within the Waterbeach Conservation Area and Development Framework. Part of the rear of the site falls within green belt land and outside of the development framework. The site is located within Flood Zone 1 (low risk). A Preliminary Ecology Assessment has been submitted and is considered acceptable.”
“The proposed works have been assessed in relation to the harm to the Grade II* Listed Church. All works in this application are to the church hall and porch, which are both part of a 1970 extension to the church. The proposal is not considered to result in significant harm to the Listed Building or the character and appearance of the Conservation Area.”
Officer report
Earlier applications
Earlier permissions covered solar panels and a heat pump, a gas flue, a noticeboard, extensions and a boundary wall.
“Relevant site history Reference Description Outcome 21/03099/FUL Installation of eight solar panels to the South of the Churchroom roof and an air source heat pump outside the Churchroom Permitted S/0290/16/FL Provision of a gas flue (a balanced flue) to the Vestry roof slope (rear south-east corner of building) and two wall vents to the Vestry (South Elevation).”
“Extension Permitted S/1731/97/F Boundary Wall Permitted S/0427/83/F Extension to meeting room Permitted Table 2 Relevant site history…”
Officer report
What officers recommended
Officers recommended approval because the minor works would improve design and climate performance without significant harm to heritage, local character or residential amenity.
“The proposed works are considered to be minor and would not result in any harm to residential amenity or the character and appearance of the area due to trees screening any proposed works from public viewpoints.”
Officer report
Consultation responses
The listed-building, highways, drainage, ecology, archaeology, environmental health and other consultees raised no objections, sometimes subject to conditions.
“Supplementary Planning Documents (SPD) Biodiversity SPD – Adopted February 2022 Sustainable Design and Construction SPD – Adopted January 2020 Cambridgeshire Flood and Water SPD – Adopted November 2016 The following SPDs were adopted to provide guidance to support previously adopted Development Plan Documents that have now been superseded by the South Cambridgeshire Local Plan 2018.”
“Environmental Health- No Objection 6.8 No recommended conditions. A risk assessment may be required due to use of rainwater harvesting in a public building.”
Officer report
Residents and member views
No third-party representations were received, while Councillor Paul Bearpark supported the environmental improvements.
“Third party representations 7.1 No representations have been received.”
“Member Representations 8.1 Cllr Paul Bearpark has made a representation supporting the application on the following grounds:”
Officer report
Questions and speakers
The committee heard from the applicant and received explanations about the drainage condition and its corrected wording.
The committee vote
The committee unanimously approved the application, with officers authorised to make minor amendments to the conditions.
“By unanimous vote (Cllrs Anna Bradnam, Peter Fane, Ariel Cahn, Corinne Garvie, Tumi Hawkins, James Rixon, Lisa Redrup, Peter Sandford, Heather Williams), the Committee approved the application subject to: • The planning conditions set out in the officer’s report with minor amendments to the conditions as drafted delegated to officers including o an amendment to the reason for condition 5 to include the word ‘flooding’ - Reason: To ensure a satisfactory method of surface…”
Minutes
Conditions of approval
Approval included conditions on the approved plans, archaeological work, tree protection and a surface-water drainage scheme.
“No demolition/development shall commence until the applicant, or their agents or successors in title, has implemented a programme of archaeological work, commencing with the evaluation of the application area, that has been secured in accordance with a Written Scheme of Investigation (WSI) that has been submitted to and approved by the Local Planning Authority in writing.”
“No development, other than demolition, shall commence until a scheme for the provision and implementation of surface water drainage has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented in accordance with the approved details prior to the occupation of any part of the development or in accordance with an implementation program agreed in writing with the Local Planning Authority.”
Officer report
Sources
- South Cambridgeshire Planning Committee minutes, 10 September 2025
- Agenda and papers (council website)
Source: Plota analysis of South Cambridgeshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Council
- South Cambridgeshire
- Date
- Wednesday 10 September 2025
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- Unanimous
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- South Cambridgeshire committee decisions →
This committee's year
12 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.