400MW battery storage scheme at Land To The North Of Church Road, Wicken
Summary of planning committee decision
Decided by East Cambridgeshire Planning Committee on 1 Apr 2026.
What was proposed
The application sought a temporary 35-year battery storage scheme of up to 400MW, with battery containers, transformers, a substation, access works and underground cabling.
“The application seeks full planning permission for the installation of up to 400MW of a Battery Energy Storage Systems (‘BESS’), comprising battery containers, power conversion systems, transformer enclosures, and a substation building. The BESS is proposed to be operational for a temporary 35-year period and as such a temporary permission is being sought.”
“The key components of the proposal will include: • up to 170 no. Batteries with integrated power conversion system units (Power Control Systems which includes both an inverter and transformer grouped into blocks of 4). • up to 85 no. 5140kVA field transformers (2 per block of 4 no. batteries). • 2 no. 200MVA grid transformers (situated within the on-site substation). • Welfare facilities. • Cabling and connection to the compound and cabling connecting to Church Road.”
Officer report
The site and surroundings
The site lies between Soham and Wicken, alongside existing solar farms, public rights of way and near Wicken Fen, within areas at flood risk.
“The site is located approximately 2km south-west of Soham and 600 to the east of Wicken. The site straddles the parish boundaries of Wicken and Soham – however the main physical development is located within Soham parish.”
“The site lies in high risk (Flood Zone 3) and medium risk (Flood Zone 2) of flooding and in an area benefiting from flood defences.”
Officer report
Earlier planning history
A previous screening opinion concluded that the battery storage scheme was not environmental impact assessment development.
“24/00883/SCREEN Screening Opinion - Battery Energy Storage Scheme Concluded by officers not to be EIA development. October 2024”
Officer report
What officers recommended
Officers recommended approval because renewable-energy benefits and energy security outweighed limited, localised landscape harm and other effects could be controlled by conditions.
“The scheme would provide battery storage for electricity, lessening the pressure on the grid given the recent rise in demand for renewable energies and would assist toward energy security and management. The PPG identifies that Battery Energy Storage Systems enable the use of energy more flexibly and de-carbonise the energy system cost-effectively, deferring or avoiding the need for costly network upgrades…”
“The proposal would cause some harm to the character and appearance of the immediate surrounding area to the site resulting, with visual effects highly noticeable, particularly to those using the public rights of way adjacent to the development, until the landscaping matures which will reduce this effect over time. Therefore, there is some conflict with the development plan.”
Officer report
What consultees and residents said
Objections focused on landscape, noise, fire safety, agricultural land, ecology, access, public rights of way, flood risk, pollution and effects on Wicken Fen.
“Soham Town Council - 25 February 2026 Soham Town Council agree and support Wicken Parish Council comments regarding proposal. Fire risk - although the risk of a fire is low, the application does not demonstrate the processes with which a fire would be dealt with, neither does it give any assurance that the infrastructure is in place to deal with a large-scale thermal runaway fire if it occurs.”
“Ward Councillor (Cllr Vellacott) - 21 April 2025 Objects for the following reasons; • Does not accord with Policies ENV1 and ENV2 due to landscape harm • Adverse impact on the character of the rural area, contrary to ENV6 • Insufficient ecological surveys contrary to ENV7 • Does not retain existing employment on the site for arable farming purposes, contrary to EMP 1 • Unsuitable access roads for construction contrary to COM7 • Does not accord with Policy SBNP19 of the Soham…”
Officer report
Professional responses
Several technical consultees raised no objection subject to conditions, while the rights-of-way team and some user groups objected to impacts on routes and access.
“CCC Local Highway Authority (Development Management) – 18 March 2026 Has reviewed the Transport Technical Note, which addresses most of the previous concerns (regarding access widths and visibility, and passing places). No objections subject to conditions securing the following;”
“CCC Local Highway Authority (Transport team) - 22 April 2025 The Transport Assessment team raise no objections to this application. With regards to issues surrounding access and visibility, the applicant is referred to the response by the Highways Development Management (HDM) team.”
Officer report
The committee vote
The proposal was moved and seconded for approval in line with the amended officer recommendation, passing by seven votes to four.
“In reply to Cllr Bill Hunt, the Major Projects Officer listed the four conditions in the Greenfire Solutions report that had been added to the recommendations, replacing condition 11 in the report. It was agreed that a condition insisting on cyber security measures should be added…”
“Cllr Bill Hunt proposed and Cllr Mark Goldsack seconded that the application be agreed, in line with the officer’s recommendations, as amended. A vote was taken and with 7 votes in favour, 4 votes against and no abstentions the Committee…”
Minutes
Sources
- East Cambridgeshire Planning Committee minutes, 1 April 2026
- Agenda and papers (council website)
Source: Plota analysis of East Cambridgeshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Council
- East Cambridgeshire
- Date
- Wednesday 1 April 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- 7 for, 4 against
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- East Cambridgeshire committee decisions →
Source: Plota analysis of the minutes.
This committee's year
7 decisions in the 12 months to this meeting.
Source: Plota analysis of the committee's minutes.