Five-turbine wind farm at Land To West Of Glenchamber Wind Farm And East Of Draingower (proposed Craig Nab Wind Energy Hub), Near New Luce

Summary of planning committee decision

Decided by Dumfries Planning Applications Committee on 30 Sept 2026.

24/2545/FULApproved

What was proposed

The application proposed five large wind turbines, access tracks, electrical infrastructure, battery storage, borrow pits and associated construction works.

“Five wind turbines, with a maximum blade tip height of 200m (Turbine 3) and 230m (Turbines 1, 2, 4 and 5); • Candidate turbine is Siemens Gamesa SG 6.6-170 with a maximum hub height of 145 metres, and an operating capacity of 6.6MW; • Foundations, crane hardstandings and temporary laydown areas at each turbine; • Watercourse crossings and associated infrastructure; • Internal access tracks of some 3.3 km total length; • On-site underground electrical cables and cable…”

“During construction of the wind farm, it is expected at least some 2500m³ of aggregate would be transported to the site for initial works. Access would be obtained via the U89W public road that bisects the site, with new accesses into the site confines and new tracks to include floating tracks.”

Officer report

The site and surroundings

The site is open boggy moorland with watercourses, nearby protected areas, existing wind farms, scattered homes and recreational routes.

“Site description: The site is located some 18km west of Newton Stewart and 5.5km north of the A75 Stranraer-Newton Stewart road, on open boggy moorland in an undulating upland setting. It is some 130m to 160m height AOD. The principal site is relatively flat, traversing the U89W road running from the C3W near Gass to C1W at New Luce.”

“Plantation forestry abutting the site’s north-east side; • Dranigower and Drumpail Burns along the east and west site boundaries, with numerous tributaries crossing the site; • Cross Water of Luce, Water of Luce and Tarf Water are significant rivers in the wider area representing the wider catchment for the streams and tributaries at and around the site; • Southern Upland Way (SUW) passes the site from some 1km to the west; • Artfield Fell, Glenchamber and Carscreugh wind…”

Officer report

Earlier applications

Earlier permissions and consultations concerned a temporary meteorological mast and an environmental scoping opinion for the proposed wind farm.

“22/1121/FUL: Erection of meteorological mast up to 90 metres high with associated guy wires for a temporary period of 5 years at Craig Nab, land to north of U89w and 4km approx. east of New Luce Newton Stewart. Approved subject to conditions - 7 October 2022.”

“PUBLIC PUBLIC 22/2231/SCO: Request for Scoping Opinion under Environmental Impact Assessment (Scotland) Regulations 2017 for proposed wind farm comprising of 5 wind turbines (with four turbines up to 230 metres and one turbine 200 metres from base to tip) and associated infrastructure at proposed Craig Nab Wind Energy Hub 14km east of Stranraer. Response issued 6 July 2023.”

Officer report

What officers recommended

Officers recommended approval subject to legal agreements and conditions, finding the scheme broadly policy compliant despite localised landscape effects.

“The development is generally acceptable in landscape terms noting an existing context of larger typology turbines. Negative landscape effects are described to the immediate west in specific views, but these are considered to be localised impacts. Cumulatively, the proposal would be set within a wider context of wind energy development and would not significantly harm the landscape character.”

“The proposed scheme is considered to be broadly compliant with the provisions of the relevant development plan policies, and as there are no material considerations of sufficient weight to justify a reason for refusal or otherwise override the presumption in favour of a determination in accordance with the terms of the development plan, it is recommended that this proposal is approved subject to the conclusion of legal agreement(s) and the conditions listed below.”

Officer report

The main planning issues

The assessment considered renewable energy, landscape and visual effects, the natural environment, homes, transport, heritage, aviation, restoration and public benefits.

“The key considerations in the assessment of this application are:- • Principle of development, climate change, carbon balance and contribution to renewable energy • Landscape and visual impacts, including cumulative effects • Natural environment • Impacts on residential amenity • Access and traffic • Historic environment • Aviation and defence • Decommissioning and restoration • Public benefits…”

“[NB - No private water supplies have been found to be hydrologically connected to the development, and this matter is scoped out. The development would not affect forestry, trees and woodlands and therefore this matter is not considered further.]”

Officer report

Objections received

Two objections raised concerns about noise, shadow flicker, peat, habitats, cumulative wind farms, heritage, landscape, tourism and New Luce’s setting.

“(a) Noise, shadow flicker and visual impacts; (b) Impacts on peat; (c) Impacts on sensitive habitats and flora; (d) Cumulative effect of wind energy development locally; (e) Impacts on cultural heritage; (f) Visual and landscape impacts; (g) Impacts on attractiveness for tourism;”

“PUBLIC PUBLIC (h) Harmful effect on setting of New Luce village.”

Officer report

The committee’s decision

The committee approved the application subject to completing the appropriate legal agreement within six months, or an agreed extended period, and conditions.

“APPROVED application 24/2545/FUL subject to (A) the successful completion of the appropriate legal agreement within 6 months of the date of the decision or such other reasonable extended timescale as agreed by the appointed officer and (B) conditions as detailed in the report.”

Minutes

Sources

  • Dumfries Planning Applications Committee minutes, 30 September 2026
  • Agenda and papers (council website)

Source: Plota analysis of Dumfries's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Dumfries
Date
Wednesday 30 September 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Minutes
The council's minutes
Meeting
Agenda and papers (council website)
Application
The application (council website)

This committee's year

34 decisions in the 12 months to this meeting, 1 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →