What was proposed
Retrospective permission was sought for a bridge, fencing, a partial field change of use and an alternative domestic access route.
“DESCRIPTION: Construction of a bridge over Bishopton Beck with the installation of post and rail fencing with gates. Part change of use of existing field to allow formation of a road linking into the existing stable yard and field access, to provide alternative domestic access route to the dwelling (Retrospective Application)”
“Thi s document was cl as s ified as : OFFICIAL 2. Retrospective planning permission is sought for the construction of a vehicular bridge to connect the application site to the domestic garden and wider plot of West End. The application site was originally part of a field which allowed horses to stay and graze on the land. Therefore, a part change of use is required to facilitate the hardstanding for this connecting access route to the bridge.”
Officer report
The site and its setting
The site lies north of The Green beside Bishopton Beck, includes stables and field hardstanding, and is within the Bishopton Conservation Area.
“APPLICATION AND SITE DESCRIPTION 1. This application site relates to a segment of land located off ‘The Green’ main road. The application site sits North of this main road, and to the East is a beck, followed by the application site property of West End. To the East of this beck is also the residential neighbouring garden of 1 The Green. It should be noted that this garden is not directly attached to this neighbouring property of 1 The Green.”
“It should be noted that the field contains two existing stable buildings and hardstanding in association with the field use. The hardstanding for the stable area has been replaced to match the material of the new access road. The stable blocks and field are within the applicant’s ownership, with the horses stored on site belong to the applicant.”
Officer report
What officers recommended
Officers recommended approval subject to conditions after finding no unacceptable effects on character, ecology, amenity, highways or flood risk.
“MAIN PLANNING ISSUES 5. The main planning issues are whether the proposed retrospective works are acceptable in terms of their impact on: (a) Character (b) Ecology (c) Amenity (d) Highway Safety (e) Flood Risk (f) Residual Matters…”
“PLANNING POLICIES 6. The application has been considered in line with the National Planning Policy Framework (NPPF) and relevant policies of the Darlington Local Plan, which seek to ensure that new development: • Reflects the local environment and creates an individual sense of place with distinctive character (Policy DC1).”
Officer report
What consultees said
The Environment Agency, archaeology and highways consultees raised no objections overall, while the Parish Council objected to the proposed access and junction safety.
“RESULTS OF TECHNICAL CONSULTATION Environment Agency 7. Overall, no objections. Whilst it has been assessed that the bridge does not increase risk to others, the new bridge is considered unsuitable for emergency access/egress in the event of a flood. As noted in the Flood Risk Assessment, the applicant is in breach of Environmental Permitting Regulations 2016, and has been issued with a formal warning from the Environment Agency. A permit cannot be issued retrospectively.”
Officer report
What people said
Three properties objected over access, safety, flooding, ecology, privacy and other matters, while 20 properties supported the works and their claimed benefits.
“Main concerns: • Planning permission not obtained for driveway that has been installed within domestic curtilage. • Installation of hardstanding on field and domestic plot has eroded the natural green space for this area. • Impacts upon BNG • Errors on the planning application form • The applicant only has a right of way over the existing access, they do not own the existing access.”
“Main support reasons: • Bridge is of solid construction and in keeping with the area • The works have resulted in a visual and land management improvement to the field/ paddock. Previously the field was neglected, used as a ‘dumping ground’ and for ‘antisocial behaviour’. • The existing shared vehicular access has reduced visibility when leaving/ entering, creating a highway and pedestrian safety issue.”
Officer report
Who spoke
The committee heard from the agent and two objectors, alongside the submitted consultation views and consultee advice.
The committee’s decision
The committee granted planning permission subject to approved plans, biodiversity measures and upgrading the existing field access.
“Within a period of 3 months of the date of this decision, either a Biodiversity Enhancement Management Plan (BEMP) or Habitat Management and Maintenance Plan (HMMP), prepared in accordance with the submitted Biodiversity Net Gain Statement, shall be submitted to and approved in writing by the Local Planning Authority.”
“The existing field access shall be formed in a sealed bitmac surface material, between the carriageway edge and highway boundary, within not later than 3 months from the date of this hereby approved development. Works shall be completed in accordance with the details approved in writing by the Local Highway Authority, as part of an agreement granted under Section 184 of The Highways Act 1980.”
Minutes
Sources
- Darlington Planning Applications Committee minutes, 27 August 2025
- Agenda and papers (council website)
Source: Plota analysis of Darlington's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Council
- Darlington
- Date
- Wednesday 27 August 2025
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- Darlington committee decisions →
This committee's year
7 decisions in the 12 months to this meeting, 1 against officer advice.
Source: Plota analysis of the committee's minutes.