Up to five dwellings at Dagnell End Road, Redditch. Mr P Bubb
Summary of planning committee decision
Decided by Bromsgrove Redditch Planning Committee on 6 Aug 2026.
What was proposed
The application sought permission in principle for up to five dwellings, with location, land use and development amount considered at this stage.
“Permission in Principle (PiP) Stage: The Local Planning Authority assesses the site’s suitability based only on three core factors: • Location; • Land Use • Amount of development (e.g. number of dwellings)”
“If a PiP is granted, a subsequent application for Technical Details Consent must be submitted and approved before any development can begin. This stage involves the detailed design aspects, such as appearance, layout, landscaping, and access, and requires full architectural plans and supporting technical documents. The TDC stage is similar to a Reserved Matters application or a full planning application.”
Officer report
Planning history
Nearby land was allowed on appeal for 214 homes and supporting infrastructure, while the application site had no relevant planning history.
“Relevant Planning History No relevant planning history.”
“There is a sporadic run of development on Dagnell End Road, approximately 257 metres to the west. On the other side of Dagnell End Road opposite the site entrance is The Abbey Hotel, and to the west of the Abbey Hotel lies a parcel of land which was subject of an allowed appeal for 214 homes and supporting infrastructure (Appeal Ref: APP/Q1825/W/24/3350905).”
Officer report
Flooding and future details
The site is in Flood Zone 1, but previous flooding was reported along the road, so a detailed drainage strategy would be needed at the technical stage.
“North Worcestershire Water Management • The proposed development site is situated within the catchment of the River Arrow. The site comprises an area of 0.3 ha, with current land use noted as paddock land. The site falls within Flood Zone 1 and it is not considered that there is any significant fluvial flood risk to the site.”
“While in principle I have no issues with the proposed development from a flood risk perspective, no drainage details have been provided with this application. I would therefore suggest the applicant at the technical matters stage of the application include a comprehensive drainage strategy to avoid the need for conditions. This should be in the form of a drainage plan and should include the means to manage surface water from the site appropriately.”
Officer report
Consultation responses
Highways and water management raised no objection at the permission in principle stage, while no public representations were initially received.
“Worcestershire Highways - Bromsgrove • No objection. • WCCHA comment the site is located on the B4101 Dagnell End Road on the outskirts of Redditch and it is noted that the application for the proposed residential development has been made in accordance with the Town and Country Planning (Permission in Principle) Order 2018 (amended). • At the ‘in principle’ stage, the scope of considerations is limited to location, land use and amount of development.”
“Based on Severn Trent Water records, there are no nearby public sewers to connect to. An alternative option could be to discharge to the waterbody to the south of the site. But as this appears to be outside of the ownership boundary identified within the application, connecting to this waterbody will require landowner permission and an easement across third party land. Where surface water runoff cannot be kept on site an appropriate level of attenuation should be included.”
Officer report
Who spoke
A parish council representative spoke against the application, followed by the ward councillor speaking in opposition.
What members discussed
Members discussed flooding, drainage, the lack of a continuous footpath, site layout requirements and the site’s sustainable location near Redditch.
“Members then debated the application. From the comments and questions by members of the Committee, the following responses were made, and issues highlighted: • North Worcestershire Water Management (NWWM) had acknowledged that the site was within the catchment of the River Arrow, however had categorised it as Flood Zone 1, which meant there was no significant fluvial flood risk to the site.”
“Officers had concluded that the site was in a sustainable location due to its proximity to Redditch town centre and an urban sprawl.”
Minutes
The vote
The committee put the application to a vote after considering the information and other material considerations.
“RESOLVED that having had regard to all the information before them and all other material considerations that planning permission be granted.”
Minutes
The decision
Planning permission was granted, with detailed design, access, drainage and other technical matters left for a subsequent consent application.
“It was noted that the application for PIP was recommended to be granted. It was further noted that the application could not be subject to conditions and that if granted, a further application for Technical Details Consent (TDC) must be submitted and approved, before any development could commence.”
Minutes
Conditions and next steps
No conditions could be imposed at the permission in principle stage, and technical details consent must be approved before development can begin.
“Conditions cannot be placed on a Permission in Principle, and such matters will be considered at the Technical Details Consent stage. The Applicant is advised to take into consideration the advice in the consultees comments and report when considering the submission for Technical Details Consent.”
“This is a two-stage approach, and the Technical Details Consent will consider the detailed development proposals. On this basis, there are no known adverse impacts which would significantly and demonstrably outweigh the benefits as set out in limb ii) and it is recommended that Permission in Principle is granted.”
Officer report
Councillors at the meeting
- B. KumarChairVice-Chair, in the chairConservative
- A. BailesIndependent
- D. J. A. ForsytheConservative
- E. M. S. GrayLabour
- R. E. LambertConservative
- D. J. NichollLib Dem
- S. R. PetersIndependent
- J. D. StanleyConservative
- NockSubstitute for H. J. JonesConservative
- S. A. RobinsonSubstitute for J. ClarkeLib Dem
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Bromsgrove Redditch Planning Committee minutes, 6 August 2026
- Agenda and papers (council website)
Source: Plota analysis of Bromsgrove Redditch's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Council
- Bromsgrove Redditch
- Date
- Thursday 6 August 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Councillors
- 10Conservative 5Independent 2Lib Dem 2Labour 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- All decisions
- Bromsgrove Redditch committee decisions →
This committee's year
20 decisions in the 12 months to this meeting, 3 against officer advice.
Source: Plota analysis of the committee's minutes.