Food store and industrial units at Land to the West of New Courtwick Lane, Wick
Summary of planning committee decision
Decided by Arun Planning Committee on 23 Sept 2026.
What was proposed
The hybrid proposal sought a food store and two drive-through units, plus outline permission for about 8,800 square metres of industrial, storage and distribution space.
“(2) in dealing with an application for planning permission the authority shall have regard to - (a) the provisions of the development plan, so far as material to the application, (aza) a post examination draft neighbourhood development plan, so far as material to the application, (b) any local finance considerations, so far as material to the application, and (c) any other material considerations.”
“1)Full Application for Phase 1 (East of the Site) for a food store (Use Class E(a)), 2 No Drive-Thru food/beverage units (Sui Generis) with revised vehicular access, associated parking and landscaping; and…”
Officer report
The site and its setting
The site was within the built-up area boundary, with a vacant warehouse and hardstanding on the eastern part and an overgrown former nursery on the western part.
“Within the Built up Area Boundary (BUAB) DEVELOPMENT PLAN POLICIES Arun Local Plan 2011 - 2031: DDM1D DM1 Aspects of form and design quality DDM4D DM4 Extensions and alter to exist builds (res and non- res) DSP1D SP1 Design ECCDM1ECC DM1 Renewable Energy ECCSP2ECC SP2 Energy and climate change mitigation EMPDM1EMP DM1 Employment Land: Development Management EMPDM2EMP DM2 Enterprise Bognor Regis EMPSP1EMP SP1 Strategic Economic Growth ENVDM1ENV DM1 Designated Sites of…”
“The application site is located within the Built Up Area Boundary (BUAB). Phase 1, to the east of the site, is currently occupied by a warehouse and surrounding hardstanding whilst Phase 2 is currently overgrown but was previously a horticultural nursery.”
Officer report
What officers recommended
Officers recommended refusal because the proposal did not demonstrate a deliverable drainage solution and could increase flood risk on or off the site.
“However, Phase 1 fails to demonstrate that an adequate and policy-compliant drainage strategy can be achieved. Insufficient information has been provided to robustly confirm that surface water can be managed on-site without increasing flood risk elsewhere, contrary to the requirements of the NPPF and local plan policies relating to flood risk and sustainable drainage. This represents a fundamental technical constraint which weighs significantly against the proposal.”
“However, notwithstanding the acceptability of the development in principle, the proposal gives rise to fundamental concerns in respect of drainage. The submitted information fails to robustly demonstrate that a satisfactory surface water drainage strategy can be achieved without increasing flood risk on-site or elsewhere, and there remains insufficient evidence to confirm that the development can be adequately served by an appropriate and deliverable drainage solution.”
Officer report
The main planning problem
The drainage information did not prove infiltration, a watercourse discharge, safe flood management or compliance with sustainable drainage requirements.
“Furthermore, the proposed alternative strategy of piped discharge to a watercourse is incomplete, lacking hydraulic modelling, discharge rate calculations and confirmation of legal rights to outfall. In the absence of either a proven infiltration solution or a viable alternative discharge route, the application fails to establish an acceptable drainage hierarchy and, at worst, presents a scenario where no lawful drainage solution could be achieved.”
“The absence of a confirmed drainage strategy has consequential implications for flood risk and wider design compliance. The modelling and calculations submitted are either incomplete or based on unverified assumptions, including infiltration rates and discharge parameters. Key information such as drained area plans, consistent modelling outputs and clearly coordinated drainage layouts has not been provided.”
Officer report
What consultees said
Highways consultees raised no objection overall, but the Lead Local Flood Authority and council engineers maintained fundamental objections to the drainage strategy.
“LLFA - Object in the absence of an acceptable Flood Risk Assessment (FRA) and Drainage Strategy relating to further information required/updated to demonstrate method of surface water discharge.”
“Arun Engineers - Original comments state insufficient information submitted to evidence that the design of the proposal is achievable and will not increase flood risk. Further to this, the design also fails to meet current requirements in terms of sustainability. Updated details have been submitted on a number of occasions with 7 consultations having been provided with Arun Engineers maintaining their objection.”
Officer report
What people said
Objections covered traffic, litter, biodiversity, noise, supermarket need and vacant units, while some comments supported jobs and business expansion.
“-Increase in traffic -Increase in litter -Impact on biodiversity -Questioning the need for an additional supermarket -Increase in noise -Concerns the outline element is hiding elements of the scheme -No right to light surveys -Already units within Wick that are vacant and could be utilised…”
Officer report
What members debated
Members considered the revised refusal reasons, the economic emphasis in the revised national policy framework and which reasons applied to each application element.
“The Strategic Development team Leader advised that the application had been submitted in hybrid form, comprising both full and outline planning elements. Following the Committee's previous resolution, it had become apparent that the voting record did not clearly identify which refusal reasons applied to the respective elements of the application.”
“The reason for refusal relating to the proposed site access had been applied to the full planning application element, which included the vehicular access onto New Courtwick Lane. • The reason for refusal relating to the proposed pedestrian crossing on the A259 had been applied to both the full and outline elements of the application.”
Minutes
How the committee voted
The outline refusal motion was carried, and the full application refusal motion was carried unanimously.
“For the Outline Application Element, Councillor Lury proposed, and Councillor Bower seconded, that the outline element be refused for the reasons set out by officers. Following clarification of the wording to be voted upon, the motion was put to the vote and was declared carried.”
“Turning to the Full Application Element, the Committee then considered the full application element. Officers confirmed that the proposed reasons for refusal comprised:”
Minutes
The final decision
The committee refused both the outline and full elements, including drainage, highway and section 106 reasons identified for the relevant parts.
“(i) That the outline planning application be refused for the reasons set out in the officer update report; and (ii) That the full planning application element be refused for the reasons set out in the officer update report, including the revised wording of the highway access reason for refusal and the additional section 106 reasons for refusal.”
Minutes
Councillors at the meeting
- Trevor BenceReform UKFor refusal
- Richard BowerConservativeFor refusal
- Billy Blanchard-CooperChair for the meetingLib DemFor refusal
- June HamiltonIndependentFor refusal
- Paul KellyConservativeFor refusal
- Martin LuryLib DemFor refusal
- Mike NortheastLabourFor refusal
- Peggy PartridgeConservativeFor refusal
- Bob WoodmanVice-Chair for the meetingLib DemFor refusal
- Mel PenycateSubstitute for WallsgroveGreenFor refusal
- Freddie TandySubstitute for McDougallLabourFor refusal
From a unanimous vote of the 11 members present for this item.
Apologies Simon McDougall Labour, Sue Wallsgrove Green
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Arun Planning Committee minutes, 23 September 2026
- Agenda and papers (council website)
Source: Plota analysis of Arun's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Arun Planning Committee
- Council
- Arun
- Date
- Wednesday 23 September 2026
- Committee decided
- Refused
- Vote
- Unanimous
- Councillors
- 11Conservative 3Lib Dem 3Labour 2Green 1Independent 1Reform UK 1Show votes
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- Arun committee decisions →
This committee's year
59 decisions in the 12 months to this meeting, 5 against officer advice.
Source: Plota analysis of the committee's minutes.