49.9 MW battery storage system at Field On West Side Of Boothby Road, Fraserburgh

Summary of planning committee decision

Decided by Aberdeenshire Banff and Buchan Area Committee on 15 Sept 2026.

APP/2025/0765Refused

What was proposed

The application sought permission for a 49.9 MW battery storage system, associated equipment, fencing, landscaping, access and an underground grid connection.

“Full Planning Permission is sought for the installation of 49.9 MW battery energy storage system (BESS) and associated infrastructure at field on west side of Boothby Road, Fraserburgh.”

“The proposed development comprises a battery energy storage system (BESS) which is to be contained within a secured fenced compound surrounded by proposed landscaping. The site would contain the following as part of the proposal:”

Officer report

The site

The 1.23-hectare agricultural site lies within Fraserburgh’s settlement boundary, on allocated housing land near homes and a flood-risk watercourse.

“The development site covering approximately 1.23ha lies within the settlement boundary of Fraserburgh on land that is allocated as OP2 (Land to West of Boothby Road, Allocation: 590 homes and land for two full size grass pitches with changing facilities) within the approved Merryhillock Masterplan in the Aberdeenshire Local Development Plan 2023. The Merryhillock Masterplan comprises the allocated sites of OP2, OP3, OP5, and R1.”

“The site lies in close proximity (within 40m) to existing residential properties on the east side of Boothby Road. The development site currently is in agricultural use, as is much of the surrounding land. The landscape in this area is considered to be open in nature. There is an existing watercourse that borders the site along the western site boundary.”

Officer report

Site history

Earlier proposals included a refused sheltered housing and nursing home application, pre-application advice, an accepted application notice and an environmental screening opinion.

“Sheltered Housing and Nursing Home at Land Adjacent to Boothby Road, Fraserburgh, refused 6 February 2008”

“ENQ/2024/0846 Proposal of Application Notice (PoAN) under Part 2 of The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 for Installation of Battery Electricity Storage System (up to 49.9 MW) and Associated Infrastructure at Field On West Side Of Boothby Road, Fraserburgh on 11 June 2024, accepted 26 June 2024”

Officer report

Officers’ recommendation

Officers recommended refusal because the proposal would prejudice the housing masterplan and lacked information on flooding, noise, protected species, contamination and community benefits.

“The proposed site on existing agricultural land within Fraserburgh settlement allocated for housing (OP2 site, which falls within the approved Merryhillock Masterplan). The contradiction of the development with the ALDP 2023 allocation cannot be overcome, unless an approved revised Masterplan that has been the subject of a formal agreement indicates otherwise.”

“In addition, the proposal has not provided sufficient or adequate information requested by consultees and the Planning Service to demonstrate that the land is not contaminated and safe for the proposed new use and that the proposal would not result in detrimental impact on protected species, or raise unacceptable noise issues, or increase the risk of flooding. Furthermore, local and community socio-economic benefits that may be derived by the proposed development have not been demonstrated.”

Officer report

Consultation responses

Environmental Health and flood officers objected, while roads officers raised no objection subject to conditions; other consultees requested further information.

“Environment and Infrastructure Services (Flood Risk and Coast Protection) has objected to the proposal due to flood risk. The conditions set out by SEPA need to be met.”

“Scottish Environment Protection Agency (SEPA) has commented that the site is partly at risk of flooding from fluvial flooding based on the SEPA Future Flood Maps. The submitted Flood Risk Assessment has not provided sufficient information to assess the possible flood risk associated with this development. Further information on extent of land raising associated with the development and topographic information is required to be submitted by the applicant.”

Officer report

Public views

One objection cited the development’s proximity to houses and play areas and the cumulative risk of battery storage systems in the area.

“A total of 1 valid representation (1 objection) has been received. All issues raised have been considered. The letter raises the following material issues:”

“Close proximity to play areas and houses. • Cumulative risk of all BESS in the area.”

Officer report

Members’ discussion

Members considered the site could sterilise future growth, raised safety concerns near homes, and said energy storage should be properly located to protect the community.

“Members asked questions and received responses from the Senior Planner on exclusion zones and whether the site had been identified for future housing and recreational development.”

“During discussion members commented that the proposed development would effectively sterilise the area for future growth and development within Fraserburgh. They considered that, due to the proximity of existing residential properties, Officers had reached the correct recommendation and expressed concerns regarding the potential safety issues should the proposal go ahead.”

Minutes

The committee’s decision

The committee refused permission for the stated planning reasons and noted that connection to the National Grid beyond the site boundary had not been adequately demonstrated.

“Following discussion, the Committee agreed to refuse Full Planning Permission for the reasons stated in the report. Members also noted that it had not been adequately demonstrated that the proposed scheme would be able to connect with the National Grid without further works out with the current site boundary.”

“The Planning Authority considers that the application is for a development that is not in accordance with the National Planning Framework 4 (NPF4) and Aberdeenshire Local Development Plan 2023 (ALDP2023).”

Minutes

The members' reasons

“Members acknowledged that developments of this nature are, in principle important in supporting technological advancement, however they emphasised that such proposals need to be appropriately located to balance technological benefits with the wellbeing and interests of the local community.”

“Members also noted that it had not been adequately demonstrated that the proposed scheme would be able to connect with the National Grid without further works out with the current site boundary. 1.”

Minutes

Source: the council's minutes, quoted word for word.

Councillors at the meeting

Source: Plota analysis of the council's minutes; parties from the council's list of councillors.

Sources

  • Aberdeenshire Banff and Buchan Area Committee minutes, 15 September 2026
  • Agenda and papers (council website)

Source: Plota analysis of Aberdeenshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Date
Tuesday 15 September 2026
Recommendation
Officers recommended refusal
Committee decided
Refused
Councillors
10Conservative 4Reform UK 2SNP 2Independent 1Lib Dem 1Show councillors
Minutes
The council's minutes
Meeting
Agenda and papers (council website)
Application
The application (council website)

This committee's year

13 decisions in the 12 months to this meeting.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →