Solar and renewables in Tonbridge

Tonbridge received 40 renewable energy applications in the last 12 months, including 1 solar farm, 2 battery storage sites and 11 heat pumps. Of the 29 decided so far, 28 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Tonbridge

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 11 of 11 applications
29 Oct 2026 Registered 26/02054/FL

Verge Land East Of Link 20 Business Park Unit 5 Bellingham Way Larkfield Aylesford Kent

Construction and operation of a battery storage unit

Planning Permission Tonbridge
29 Oct 2026 Registered 26/02050/FL

64 Constitution Hill Snodland Kent ME6 5DH

Proposed formation of a new 3-bed dwelling to the side of 64 Constitution Hill to include solar panels to front roof slope and a Velux window to the r...

Planning Permission Tonbridge
29 Oct 2026 Registered 26/02049/FL

Orchard End Church Lane Trottiscliffe West Malling Kent ME19 5EB

Alterations to existing front dormer, replacement of front Atrium with 3 pitched roof dormers, extension to existing rear dormer, first floor terraces...

Planning Permission Tonbridge
26 Oct 2026 Registered 26/01775/FL

Commority Pilgrims Way Trottiscliffe West Malling Kent ME19 5EW

Installation of solar PV panels on garden shed

Planning Permission Tonbridge
21 Oct 2026 Registered 26/01992/LDP

14 Wells Close Tonbridge Kent TN10 4NW

Lawful Development Certificate Proposed: Hip-to-gable loft conversion with dormer to rear elevation and insertion of 4 rooflights to front roof slope....

Lawful Development Cert Proposed NEW
21 Oct 2026 Registered 26/01991/FL

14 Wells Close Tonbridge Kent TN10 4NW

Proposed hip-to-gable loft conversion with dormer to rear elevation and insertion of 4 rooflights to front roof slope. Repositioning of existing solar...

Planning Permission
2 Oct 2026 Withdrawn 30 Oct 26/01672/PDV14A

Lambourne House Long Mill Lane Platt Sevenoaks Kent TN15 8NA

Prior approval for the installation of solar equipment on domestic premises under Class A of Part 14 of Schedule 2 of the Town and Country Planning (G...

PD solar equipment domestic premises Tonbridge
14 Sept 2026 Approved 30 Oct 26/01696/PDV14J

Royal Mail Sorting Office 20 Vale Rise Tonbridge Kent TN9 1AA

Prior approval for the installation of solar equipment on Non-domestic premises under Class J of Part 14 of Schedule 2 of the Town and Country Plannin...

PD solar equipment non-domestic premises
4 Sept 2026 Registered 26/01642/FL

Little Trees 2 Bourne Lane Tonbridge Kent TN9 1LG

Demolition of existing conservatory, erection of single storey rear extension, installation of solar panels to existing roof and a detached garage to ...

Planning Permission
28 Aug 2026 Approved 14 Oct 26/01600/PDV14J

Unit 1 Invicta Park New Hythe Lane Larkfield Aylesford Kent ME20 7FG

Prior approval for the installation of solar equipment on non-domestic premises under Class J of Part 14 of Schedule 2 of the Town and Country Plannin...

PD solar equipment non-domestic premises Tonbridge
27 Aug 2026 Refused 22 Oct 26/01521/LDP

Archersmead Pilgrims Way Wrotham Sevenoaks Kent TN15 7NN

Lawful Development Certificate Proposed: Replacement of old roof tiles. Addition of solar panels. (11 "in roof" on west aspect, 7 "in roof" on East as...

Lawful Development Cert Proposed NEW Tonbridge
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Tonbridge

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Tonbridge?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Tonbridge. You can also narrow the alert to a postcode, street, or drawn area.

We check Tonbridge's planning portal daily. New solar & renewables applications appear here within a day of being published.