Solar and renewables in Stoke on Trent

Stoke on Trent received 27 renewable energy applications in the last 12 months, including 1 battery storage site and 3 heat pumps. Of the 16 decided so far, 14 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Stoke on Trent

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 7 of 7 applications
27 Oct 2026 Pending Consideration 26/PRA/01185

Westbridge Quality Furniture, Whittle Road, Meir Park, Stoke-on-trent, ST3 7TU

Installation of roof mounted (PV) solar panels on existing building under Schedule 2, Part 14, Class J of The Town & Country Planning (General Permitt...

Prior Approval Stoke On Trent
23 Oct 2026 Pending Decision 26/LBC/00584

Aynsley Tea Room, LONGTON PARK Trentham Road, Longton, Stoke-on-trent, City Of Stoke-on-trent, ST3 4AZ

Proposed Solar PV on roof and small BESS unit to be installed external to building (Fixed to wall)

Listed Building Consent Stoke On Trent
12 Oct 2026 Pending Consideration 26/LBC/00581

1 The Strand, Longton, Stoke-on-trent, City Of Stoke-on-trent, ST3 2JF

Adding Solar PV to market roof

Listed Building Consent Stoke On Trent
12 Oct 2026 Pending Consideration 26/LBC/00583

TUNSTALL MARKET, 148 High Street, Tunstall, Stoke-on-trent, City Of Stoke-on-trent, ST6 5TP

Installation of PV panels on roof with BESS adjacent to building.

Listed Building Consent Stoke On Trent
28 Sept 2026 Pending Consideration 26/FUL/01087

Verge East Of Festival Way, Festival Park, Stoke-on-trent, ST1 5SQ

Construction and operation of a micro battery storage project.

Full Planning Permission Stoke On Trent
22 Sept 2026 Pending Decision 26/PRA/01010

Steelite International Ltd, Orme Street, Burslem, Stoke-on-trent, ST6 3RB

Installation of roof solar array (prior approval)

Prior Approval Stoke On Trent
28 Aug 2026 Pending Consideration 26/FUL/00724

Aldi, ALDI Daisy Bank Road, Norton, Stoke-on-trent, City Of Stoke-on-trent, ST1 6AX

Installation of air source heat pump (ASHP) and installation of gates at existing Aldi foodstore

Full Planning Permission Stoke On Trent
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Stoke on Trent

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Stoke on Trent?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Stoke on Trent. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Stoke on Trent's planning portal daily. New solar & renewables applications appear here within a day of being published.