Solar and renewables in Rother

Rother received 39 renewable energy applications in the last 12 months, including 1 battery storage site and 8 heat pumps. Of the 25 decided so far, 23 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Rother

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
5 Nov 2026 Pending Consideration RR/2026/1382/HOU

Chaldon, 13 Haslam Crescent, Bexhill, East Sussex, TN40 2PD

Alterations to the existing roof, including the enlargement and formation of dormer windows to provide additional first-floor accommodation, together ...

Householder Planning Rother
4 Nov 2026 Pending Consideration RR/2026/1329/HOU

Starrs Green House, 27 Hastings Road, Battle, East Sussex, TN33 0TA

Erection of a detached domestic timber workshop with roof-mounted solar photovoltaic panels, following removal of existing metal storage shed.

Householder Planning Rother
30 Oct 2026 Pending Consideration RR/2026/1348/LBC

Battle Memorial Hall, 81 High Street, Battle, East Sussex, TN33 0AQ

Installation of an air source heat pump system with the external units located in an alternative position to that approved under extant Listed Buildin...

Listed Building Consent Rother
20 Oct 2026 Pending Consideration RR/2026/1291/FULL

BATTENHURST STABLES Battenhurst Road, Ticehurst, Wadhurst, East Sussex, TN5 7DU

Installation of a 30 panel ground mount solar pv system on land to west of stables.

Full Planning Rother
1 Oct 2026 Pending Consideration RR/2026/1130/LBC

Bell Inn Main Street, Iden, East Sussex, TN31 7PU

Repair and refurbishment of public house to include internal & external alterations, installation of air source heat pumps and fire escape staircase

Listed Building Consent Rother
1 Oct 2026 Pending Consideration RR/2026/1128/FULL

Bell Inn Main Street, Iden, East Sussex, TN31 7PU

Repair and refurbishment of public house to include internal & external alterations, installation of air source heat pumps & fire escape staircase, an...

Full Planning Rother
1 Oct 2026 Pending Consideration RR/2026/1220/HOU

Hurst House, 41 London Road, Hurst Green, East Sussex, TN19 7QP

Propose fitting solar panels to my house roof.

Householder Planning Rother
28 Sept 2026 Pending Consideration RR/2026/1201/HOU

139 Lydd Road, Camber, East Sussex, TN31 7RS

Part demolition of existing rear extension; erection of a two storey rear extension; replacement of existing windows; re-cladding to ground floor elev...

Householder Planning Rother
17 Sept 2026 Pending Consideration RR/2026/1158/FULL

Eastern Barn, Marley Barns Marley Lane, Battle, East Sussex

Change of use of eastern barn from agricultural use to light industrial use, with ancillary office and installation of roof-mounted solar panels

Full Planning Rother
27 Aug 2026 Pending Consideration RR/2026/0875/FULL

Land To The West Of Glovers House, Glovers End, Bexhill-on-sea, TN39 5ES

Proposed drive-thru restaurant, drive-thru coffee shop, an EV charging station and associated landscaping and access to Glovers End.

Full Planning Rother
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Rother

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Rother?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Rother. You can also narrow the alert to a postcode, street, or drawn area.

We check Rother's planning portal daily. New solar & renewables applications appear here within a day of being published.