Solar and renewables in Newcastle upon Tyne

Newcastle upon Tyne received 34 renewable energy applications in the last 12 months, including 2 battery storage sites and 10 heat pumps. Of the 22 decided so far, 21 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
9 Nov 2026 Pending Consideration 2026/1659/01/DET

The Core Newcastle Helix, Bath Lane, Newcastle Upon Tyne, NE4 5TF

Demolition of existing main entrance revolving doorset, installation of new single storey entrance lobby with automatic sliding doorset and associated...

Detailed Application
22 Oct 2026 Pending Consideration 2026/1783/01/DET

Summerhill Bowling Club Winchester Terrace, Newcastle Upon Tyne, NE4 6EH

External alterations including regrading of footpaths, formation of access terrace, cycle parking, enclosure of entrance porch, installation of solar ...

Detailed Application
21 Oct 2026 Pending Consideration 2026/1561/01/DET

Unit 9 And Unit 10 Newcastle Shopping Park, Fossway, Newcastle Upon Tyne, NE6 2UJ

Refurbishment of existing retail units comprising external alterations to facilitate amalgamation of Units 9 and 10, including installation of new sho...

Detailed Application
12 Oct 2026 Approved 20 Nov 2025/0514/11/LBC

KEELMENS HOSPITAL City Road, Newcastle Upon Tyne, NE1 2AF

Listed Building Application: Submission of details - of proposed solar photovoltaic panels to be installed on the roofs of the building and method of ...

Approval of Details Reserved by Condition
28 Sept 2026 Pending Consideration 2026/1619/01/DET

Northumbria University, LIBRARY BUILDING Sandyford Road, Newcastle Upon Tyne, NE1 8ST

Repair/replacement of brick slips at each floor slab edge, replacement of single glazed metal framed external glazing throughout, replacement of metal...

Detailed Application
24 Sept 2026 Pending Consideration 2026/1237/01/DET

Literary And Philosophical Society, 23 Westgate Road, Newcastle Upon Tyne, NE1 1SE

Installation of 5no. air source heat pumps, MHVR and air handling plant and equipment and photovoltaic panels to roof.

Detailed Application
24 Sept 2026 Pending Consideration 2026/1239/01/LBC

Literary And Philosophical Society, 23 Westgate Road, Newcastle Upon Tyne, NE1 1SE

Listed Building Application Internal alterations to include installation of a platform lift from basement to first floor, removal of partition walls a...

Listed Building Consent
22 Sept 2026 Approved 20 Nov 2026/1286/01/HOU

OLD TREES Middle Drive, Woolsington, Newcastle Upon Tyne, NE13 8BS

Erection of replacement single-storey sunroom; external alterations including replacement and revised fenestration, removal of redundant chimney stack...

Household Applications
11 Sept 2026 Pending Decision 2026/1524/01/HOU

3 Kimmerstone Road, Newcastle Upon Tyne, NE13 9AS

Installation of an Air Source Heat Pump to Rear (West)

Household Applications
27 Aug 2026 Approved 21 Oct 2026/1431/01/NPV

W M Morrison, UNIT 22 Denton Park Shopping Centre, West Denton, Newcastle Upon Tyne, NE5 2RA

Notification for Prior Approval for the installation of photovoltaic panels.

Prior not (Schedule 2, Pt 14, Class J)
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Newcastle upon Tyne

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Newcastle upon Tyne?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Newcastle upon Tyne. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Newcastle upon Tyne's planning portal daily. New solar & renewables applications appear here within a day of being published.