Solar and renewables in Newark and Sherwood

Newark and Sherwood received 25 renewable energy applications in the last 12 months, including 1 battery storage site and 3 heat pumps. Of the 15 decided so far, 14 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

10
|
4
|
1

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
22 Sept 2026 Registered 26/01403/FUL

Land At Kirklington Road Hockerton

Photovoltaic (PV) ground solar array including inverters and underground cabling.

Full Planning Permission Newark And Sherwood
16 Sept 2026 Registered 26/01372/FUL

Clay Barn Main Street Maplebeck Newark On Trent NG22 0BS

Siting of four bell tents measuring 4m x 4m for accommodation use. Erection of a 2 bay cart shed , installation of 6 solar panels to the roof of the e...

Full Planning Permission Newark And Sherwood
9 Sept 2026 Registered 26/01444/HOUSE

Forest Barn Dale Lane Blidworth NG21 0SU

Removal of existing garage. Two storey side/rear and single storey rear extension with timber cladding, balcony, alterations to windows and doors, PV ...

Planning Permission Newark And Sherwood
3 Sept 2026 Registered 26/01413/HOUSE

1 Church Court Norwell Newark On Trent NG23 6JL

Installation of air source heat pump.

Planning Permission Newark And Sherwood
3 Aug 2026 Approved 23 Sep 26/01169/HOUSE

Cedar View 1 Canons Close Southwell NG25 0GA

Installation of solar panels to rear elevation.

Planning Permission Newark And Sherwood
28 Jul 2026 Registered 26/01110/HOUSE

Field House Bleasby Road Thurgarton NG14 7FW

Alterations to house including increase porch size, replacement windows and doors, rooflights and raise roof and add roof lantern, balcony and solar P...

Planning Permission Newark And Sherwood
17 Jul 2026 Approved 4 Sep 26/01038/FULM

Maun Infant And Nursery School Walesby Lane Ollerton Newark On Trent NG22 9RJ

Installation of maximum 8No Air source heat pumps and associated containment secure fencing

Full Planning Permission Major Newark And Sherwood
9 Jul 2026 Registered 26/01064/LDCP

Marple House Westgate Southwell NG25 0LD

Certificate of Lawfulness for proposed installation of 12 solar panels to the existing garage block

Lawful Development Certificate Proposed Newark And Sherwood
9 Jul 2026 Approved 8 Sep 26/01062/HOUSE

The Tanyard 2 Island Farm Kirton Road Egmanton Newark On Trent NG22 0HF

Install an Air Source Heat Pump to the east (rear) side of the property

Planning Permission Newark And Sherwood
9 Jul 2026 Registered 26/01063/FUL

Junction Kelham Road Newark On Trent

The construction and operation of a micro battery storage project.

Full Planning Permission Newark And Sherwood
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Newark and Sherwood

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Newark and Sherwood?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Newark and Sherwood. You can also narrow the alert to a postcode, street, or drawn area.

We check Newark and Sherwood's planning portal daily. New solar & renewables applications appear here within a day of being published.