Planned new homes in Hammersmith and Fulham

30 applications for new homes were submitted in Hammersmith and Fulham in the last 12 months, proposing 27 dwellings between them. The largest single scheme proposes 27 homes. New applications appear here within a day of the council publishing them.

15 last 90 days
|
7 last 30 days
|
4 last 14 days

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 15 of 15 applications
P/2026/01658/PACU1 7 Jul 2026 REGISTERED

34 Galena Road, London, W6 0LT

Change of use of the existing building from offices (Class E) into 6no self-contained residential flats (Class C3).

Prior Approval Change of Use - Commercial/Business/Service to Dwellinghouses, Schedule 2, Part 3, Class C Hammersmith And Fulham 7 Jul 2026
P/2026/01630/PACU1 7 Jul 2026 REGISTERED

29A Margravine Road, London, W6 8LL

Change of use of existing buildings from offices (Class E) into 8no self-contained residential flats (Class C3) comprising of 6no flats within 'Buildi...

Prior Approval Change of Use - Commercial/Business/Service to Dwellinghouses, Schedule 2, Part 3, Class C Hammersmith And Fulham 7 Jul 2026
P/2026/01318/HH 6 Jul 2026 REGISTERED

Flat B, 29 New King's Road, London, SW6 4SB

Erection of an additional floor at main roof level.

Full Planning Application Hammersmith And Fulham 6 Jul 2026
P/2026/01579/PACU1 30 Jun 2026 REGISTERED

2-12 And 5-9 Rickett Street, London, SW6 1RU

Change of use of the existing properties from offices (Class E) to 9no. residential dwellings (Class C3).

Prior Approval Change of Use - Commercial/Business/Service to Dwellinghouses, Schedule 2, Part 3, Class C Hammersmith And Fulham 30 Jun 2026
P/2026/01400/FUL 18 Jun 2026 REGISTERED

17 Chesson Road, London, W14 9QR

De-conversion of the existing building from 2no self-contained flats into a single family dwellinghouse.

Full Planning Application Hammersmith And Fulham 18 Jun 2026
P/2026/01248/FUL 17 Jun 2026 REGISTERED

82-84,New King's Road London SW6 4LU

Erection of rear and side roof extensions, erection of rear extensions at first and second floor level in connection with the creation of 1 x 2 bedroo...

Full Planning Application Hammersmith And Fulham 17 Jun 2026
P/2026/01437/PAND2 16 Jun 2026 Pending

Griffin House, 161 Hammersmith Road, London, W6 8BS

Erection of an additional floor at roof level in connection with the creation of 34no self-contained flats (Class C3).

Prior Approval - New Flats on top of detached Commercial Buildings, Schedule 2, Part 20, Class AA Hammersmith And Fulham 16 Jun 2026
P/2026/01017/CLE 7 Jun 2026 REGISTERED

Flat 2 And Flat 4,493 Fulham Palace Road,London SW6 6SU

Amalgamation of the front part of first floor level to use as a two bedroom self-contained flat (de-conversion from flat 2A and 2B into a single two b...

Certificate of Lawfulness Existing Hammersmith And Fulham 7 Jun 2026
P/2026/00988/FUL 7 Jun 2026 REGISTERED

Land To The Side Of No. 47 Lillie Road And Rear Of No. 3. 4, 5, 6, 7, 8 And 9 Peel Place London SW6

Change of use of ancillary hotel storage spaces (Class C1) located at the side of no. 47 Lillie Road into residential storage spaces (Class C3) incorp...

Full Planning Application Hammersmith And Fulham 7 Jun 2026
P/2026/01128/CLE 1 Jun 2026 Pending

64 A Ormiston Grove,London,Hammersmith And Fulham,W12 0JS

Continued use of the second floor level and front part of the first floor level as four self-contained studio flats (Amended description).

Certificate of Lawfulness Existing Hammersmith And Fulham 1 Jun 2026
2025/03182/FUL 18 May 2026 Pending

49B And 51 New King's Road London SW6 4SE

Erection of a rear extension at second floor level, over part of the existing back addition, in connection with the conversion of the existing first a...

Full Planning Application Hammersmith And Fulham 18 May 2026
P/2026/01323/PACU1 18 May 2026 Pending

309 Lillie Road, London, SW6 7LL

Change of use from Class E into 2no. self-contained flats Use Class C3. read more

Prior Approval Change of Use - Commercial/Business/Service to Dwellinghouses, Schedule 2, Part 3, Class C Hammersmith And Fulham 18 May 2026
2021/03131/FUL 18 May 2026 Pending

261 - 267 Lillie Road London SW6 7LL

Demolition of existing warehouse (Use Class B8) and ancillary office; erection of a part one, part two, part three and part four storey building to pr...

Full Planning Application Hammersmith And Fulham 18 May 2026
P/2026/01329/PACU1 18 May 2026 Pending

Griffin House, 161 Hammersmith Road, London, W6 8BS

Change of use of the existing building from offices (Class E) into 139no. self-contained flats (Class C3). read more

Prior Approval Change of Use - Commercial/Business/Service to Dwellinghouses, Schedule 2, Part 3, Class C Hammersmith And Fulham 18 May 2026
P/2026/00633/FUL 11 May 2026 Pending

1 - 3 Sussex Place, London, W6 9EA

Demolition of the existing building and redevelopment of the site comprising the erection of a 14-storey (plus basement) building to provide purpose-b...

Full Planning Application Hammersmith And Fulham 11 May 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new new homes applications in Hammersmith and Fulham

Set up alerts

Frequently asked questions

What's the difference between outline and full planning permission?
Outline planning permission establishes the principle of development (is housing acceptable here?) while leaving specifics like layout and appearance to later applications. Full planning permission includes all details upfront. Outline is typically followed by 'reserved matters' applications that fill in the specifics.
What are 'reserved matters' in a planning application?
Details that an outline permission left to be approved later. There are five reserved matters: access, appearance, landscaping, layout and scale. They must usually be submitted within 3 years of the outline permission being granted.
How long does a planning decision for a new home take?
Statutory targets are 8 weeks for minor applications (1-9 dwellings) and 13 weeks for major applications (10+ dwellings), measured from the date the application is validated. Complex cases or appeals can take much longer.
Can I get email alerts for new new homes applications in Hammersmith and Fulham?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new new homes application published by Hammersmith and Fulham. You can also narrow the alert to a postcode, street, or drawn area.

We check Hammersmith and Fulham's planning portal daily. New new homes applications appear here within a day of being published.