1 Farriers Yard, London, W6 8AH Data via plota.co.uk

P/2026/02216/PACU1 - Prior Approval Change of Use - Commercial/Business/Service to Dwellinghouses, Schedule 2, Part 3, Class C REGISTERED: Under Assessment

Proposal

Change of use of the fifth floor level from commercial (Use Class E) into 10no. self-contained residential units (Use Class C3); associated bin and cycle stores at ground floor level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Aug 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Oct 2026, from Hammersmith and Fulham's recent commercial premises.

The consultation period closed on 30 Sept 2026.

Documents 39

Plans & drawings 29

PDF FF-P-70-05-02-P5-05-PROPOSED FIFTH FLOOR PLAN-P2 Revised · 11 Sept 2026 View ↗ PDF 260302 - farriers yard existing section-aa ff-p-26-mf-aa-01 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing third floor plan ff-p-70-03-01-05 p1. Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing basement floor plan ff-p-70-b1-01-01 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing elevation ne ff-p-25-mf-ne-03 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing elevation nw ff-p-25-mf-nw-04 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing elevation se ff-p-25-mf-se-02 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing elevation sw ff-p-25-mf-sw-01 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing fifth floor plan ff-p-70-05-01-07 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing first floor plan ff-p-70-01-01-03 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing fourth floor plan ff-p-70-04-01-06 p1. Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing ground floor plan ff-p-70-00-01-02 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing roof plan ff-p-70-rf-01-08 p1 Drawing · 24 Aug 2026 View ↗ PDF farriers yard existing second floor plan ff-p-70-02-01-04 p1 Drawing · 24 Aug 2026 View ↗ PDF location plan ff-p-00-01-01 p1 Drawing · 24 Aug 2026 View ↗ PDF existing site plan ff-p-os-0-01 p1 Site Plan · 24 Aug 2026 View ↗ PDF ff-p-25-mf-p-ne-p3-03-elevation ne-p1 Drawing · 24 Aug 2026 View ↗ PDF ff-p-25-mf-p-nw-p4-04-elevation nw-p1 Drawing · 24 Aug 2026 View ↗ PDF ff-p-25-mf-p-se-p2-02-elevation se-p1 Drawing · 24 Aug 2026 View ↗ PDF ff-p-25-mf-p-sw-p1-01-elevation sw-p1 Drawing · 24 Aug 2026 View ↗ PDF ff-p-26-mf-p-aa-s1-05-proposed section aa Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-0g-02-pg-00-proposed ground floor-p2 Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-01-02-p1-01-proposed first floor-p1 Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-02-02-p2-02-proposed second floor-p1 Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-03-02-p3-03-proposed third floor-p1 Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-04-02-p4-04-proposed fourth floor-p1 Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-05-02-p5-05-proposed-fifth floor-p1 Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-b1-p0--01-proposed bf plan-p1 Proposed Drawings · 24 Aug 2026 View ↗ PDF ff-p-70-rf-02-p6-06-proposed roof plan-p1 Proposed Drawings · 24 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Conservation area 38 m away: Hammersmith Odeon; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 69 m away: Hammersmith Town Centre.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £22,500 in May 2018. Other property, leasehold.

22 May 2018£22,500Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval Change of Use - Commercial/Business/Service to Dwellinghouses, Schedule 2, Part 3, Class C
Postcode
W6 8AH
Received
24 Aug 2026
Validated
24 Aug 2026
Ward
Hammersmith Broadway
Case officer
Show

Decision outlook

Day 65, past Hammersmith and Fulham's usual 61 days for commercial premises. 84% are decided within thirteen weeks, so most likely by 23 Nov 2026.

Day 6526 days to the 91-day target
45%decided within 8 weeks
96%approved
81decided in the last year

Plota live figures for commercial premises decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
26 Aug 2026
Comments by
30 Sept 2026
Site or press notice
9 Sept 2026
Statutory expiry
19 Oct 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Change of use

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.