109 - 111 Fulham Palace Road, London, W6 8JA Data via plota.co.uk

P/2026/01460/FUL - Full Planning Application REGISTERED: Under Assessment

Proposal

Conversion of the existing basement level from 2no. offices (Class E) into 2no. self-contained flats (Class C3) comprising of 1 x 1 bedroom flat and 1 x studio flat; installation of a door and 3no. windows, to the rear elevation at basement level; erection of an external staircase, to the rear elevation leading from the basement to ground floor level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jun 2026
✓
Validated
19 Aug 2026
Decision
Target date was 14 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Oct 2026, from Hammersmith and Fulham's recent commercial premises.

The consultation period closed on 16 Sept 2026.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Conservation area 13 m away: Crabtree
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 39 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area73 m² (786 sq ft)
Energy ratingB (asset rating 47)
UseRetail/Financial and Professional Services
HeatingAir Conditioning

From the energy performance certificate lodged in July 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W6 8JA
Received
7 Jun 2026
Validated
19 Aug 2026
Ward
Hammersmith Broadway
Case officer
Show
Applicant
Show
Leaseholder
Show

Decision outlook

Day 70, past the statutory target. 84% of commercial premises in Hammersmith and Fulham are decided within thirteen weeks, which runs to 18 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 7014 days past the 56-day target
45%decided within 8 weeks
96%approved
81decided in the last year

Plota live figures for commercial premises decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
19 Aug 2026
Comments by
16 Sept 2026
Site or press notice
26 Aug 2026
Statutory expiry
14 Oct 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.