Solar and renewables in Guildford

Guildford received 27 renewable energy applications in the last 12 months, including 1 battery storage site. Of the 11 decided so far, 9 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

11
|
7
|
3
Get alerts for Guildford

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 11 of 11 applications
26/P/01111 18 Aug 2026 Registered

Follyfoot Farm, Guildford Lane, Albury, Guilford, GU5 9BG

Certificate of Lawfulness for a proposed development to establish whether the installation of sol...

C of Lawfulness for Proposed Use or Dev Guildford 18 Aug 2026
26/P/01079 12 Aug 2026 Registered

Beech Tree Cottage, 2 Home Villas, Farley Heath, Albury, Guildford, GU5 9ER

Installation of solar panels to roof of two outside stores (two panels per store) and twelve pane...

Full Application Guildford 12 Aug 2026
26/CON/00027 11 Aug 2026 Awaiting decision

Whitefield House, Littleworth Road, Seale, Farnham, Surrey GU10 1JJ

Consultation from Waverley Borough Council for "Erection of extensions and alterations to dwellin...

Neighbouring Authority Guildford 11 Aug 2026
26/P/01050 6 Aug 2026 Registered

Guildford Baptist Church Millmead Centre, Millmead, Guildford, GU2 4BE

Certificate of Lawfulness for a proposed development to establish whether the installation of photovoltaic (PV) solar panels on the south-facing pitch...

C of Lawfulness for Proposed Use or Dev Guildford 6 Aug 2026
26/P/01044 5 Aug 2026 Registered

Little Acre, Shere Road, West Clandon, Guildford, GU4 8SG

extention of garage to form larger double garage with solar panels (Retrospective)

Full Application Guildford 5 Aug 2026
26/P/01047 3 Aug 2026 Registered

Unit 7B, Henley Business Park, Pirbright Road, Normandy, Guildford, GU3 2DX

Installation of 3 blocks of roof mounted solar PV with a ground floor hybrid energy storage cabinet.

Full Application Guildford 3 Aug 2026
26/P/01023 27 Jul 2026 Registered

Woodlands, Park Corner Drive, East Horsley, Leatherhead, KT24 6SF

Erection of a 5-bedroom dwelling, including a new swimming pool, ASHPs, PV panels, new garden room, other associated works (including landscaping work...

Full Application Guildford 27 Jul 2026
26/P/00919 23 Jul 2026 Registered

Northcote, Hooke Road, East Horsley, Leatherhead, KT24 5DY

Construction of a two storey four bedroom detached dwelling with solar panels to roof following demolition of existing buildings (self-build).

Full Application Guildford 23 Jul 2026
26/P/00948 23 Jul 2026 Registered

Unit 1c, Henley Business Park, Pirbright Road, Normandy, Guildford, GU3 2DX

Install SolaX AELIO-P50B200 Hybrid Energy Storage Cabinet at ground level local to the industrial unit to store energy from the roof mounted solar PV

Full Application Guildford 23 Jul 2026
26/P/00903 21 Jul 2026 Registered

29 Monro Drive, Guildford, GU2 9PS

Certificate of lawfulness for proposed development to establish whether the installation of roof-mounted solar photovoltaic panels to the existing dwe...

C of Lawfulness for Proposed Use or Dev Guildford 21 Jul 2026
26/P/00809 19 Jun 2026 Approved

Verge between Woking Road and Whitemore Road, Guildford, GU1 1QX

Proposed construction and operation of a micro energy storage system, known as a battery box.

Full Application Guildford 19 Jun 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Guildford

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Guildford?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Guildford. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Guildford's planning portal daily. New solar & renewables applications appear here within a day of being published.