Solar and renewables in Coventry

Coventry received 43 renewable energy applications in the last 12 months, including 1 solar farm, 6 battery storage sites and 5 heat pumps. Of the 32 decided so far, 30 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Coventry

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 11 of 11 applications
6 Nov 2026 Pending Consideration PL/2026/0001929/FUL

Finham Park 2 Torrington Avenue, Coventry, CV4 9WT

Installation of a proposed battery energy storage system (BESS) and associated infrastructure

FUL minor application
4 Nov 2026 Pending Consideration PL/2026/0001768/HHA

2 Duke Street, Coventry, CV5 8BZ

Replacement of existing windows and installation of 8no. photovoltaic panels to the front elevation (part retrospective).

HHA Householder application for planning permission for works or extension to a dwelling
21 Oct 2026 Pending Consideration PL/2026/0001522/LDCP

Block Units 1 To 2, Napier Street Industrial Estate Napier Street, Coventry, CV1 5PR

Lawful development certificate for proposed installation of 2no. rooftop mounted solar panels

LDCP Certificate of lawful development proposed
20 Oct 2026 Pending Consideration PL/2026/0001720/LDCP

67 Spencer Avenue, Coventry, CV5 6NQ

Lawful development certificate for proposed installation of an air source heat pump

LDCP Certificate of lawful development proposed
15 Oct 2026 Pending Consideration PL/2026/0001814/HHA

16 Poppyfield Court, Coventry, CV4 7HW

Installation of air source heat pump to side of property

HHA Householder application for planning permission for works or extension to a dwelling
9 Oct 2026 Pending Consideration PL/2026/0001632/FUL

Potters Green Primary School Ringwood Highway, Coventry, CV2 2GF

Installation of battery energy storage system, inverter and associated infrastructure

FUL minor application
5 Oct 2026 Pending Consideration PL/2026/0001731/FUL

28 The Shrubberies, Coventry, CV4 7EF

Change of use of land from public open space to residential garden land and private parking layout incorporating Electric Vehicle (EV) charging infras...

FUL minor application
5 Oct 2026 Pending Consideration PL/2026/0001644/HHA

128 Mantilla Drive, Coventry, CV3 6LJ

Extension to the existing side extension and replacement of the existing flat roof with a pitched roof, alterations to all elevations including replac...

HHA Householder application for planning permission for works or extension to a dwelling
1 Oct 2026 Pending Consideration PL/2026/0001519/FUL

Rowleys Green Working Mens Club, 250 Burbages Lane, Coventry, CV6 6AW

Erection of two drive thru units and one accompanying unit, for flexible commercial use comprising of Use Class E (a) (Display or retail sale of goods...

FUL minor application
23 Sept 2026 Pending Consideration PL/2026/0001634/FUL

Moseley Primary School Moseley Avenue, Coventry, CV6 1AB

Installation of a proposed battery energy storage system (BESS) and associated infrastructure

FUL minor application
27 Aug 2026 No comment PL/2026/0001504/NAC

Land South East Of Shilton Lane And South And South East Of Lentons Lane, Coventry

Consultation from Rugby Borough Council for appeal ref: 6013514 for planning application R25/0883 for Solar Farm Development including solar arrays, c...

NAC Neighbouring authority consultation
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Coventry

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Coventry?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Coventry. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Coventry's planning portal daily. New solar & renewables applications appear here within a day of being published.